Overview of progress on the improvement projects for the LANSCE accelerator and target facilities

被引:0
|
作者
Macek, RJ [1 ]
Browne, JC [1 ]
Brun, T [1 ]
Donahue, JB [1 ]
Fitzgerald, DH [1 ]
Pynn, R [1 ]
Schriber, SO [1 ]
Weinacht, D [1 ]
机构
[1] Univ Calif Los Alamos Natl Lab, Los Alamos, NM 87545 USA
来源
PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS | 1998年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Three projects have been initiated since 1994 to improve the performance of the accelerator and target facilities for the Los Alamos Neutron Science Center (LANSCE). The LANSCE Reliability Improvement Project (LRIP) was separated into two phases. Phase I, completed in 1995, targeted near-term improvements to beam reliability and availability that could be completed in one-year's time. Phase II, now underway and scheduled for completion in May 1998, consists of two projects: a) implementation of direct H- injection for the Proton Storage Ring (PSR) and b) an upgrade of the target/moderator system for the short pulse spallation neutron (SPSS) source. The latter will reduce the target change-out time from about 10 months to about three weeks. The third project, the SPSS Enhancement Project, is aimed at increasing the PSR output beam current to 200 mu A at 30 Hz and providing up to seven new neutron scattering instruments.
引用
收藏
页码:1159 / 1161
页数:3
相关论文
共 23 条
  • [1] STATUS OF ACCELERATOR FACILITIES AND THEIR PROGRESS IN JAPAN
    KIKUCHI, K
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1979, 26 (03) : 3124 - 3129
  • [2] Overview of Radiation Accidents at Industrial Accelerator Facilities
    Janzekovic, Helena
    26TH INTERNATIONAL CONFERENCE NUCLEAR ENERGY FOR NEW EUROPE (NENE 2017), 2017,
  • [3] The Target Laboratory of the Pelletron Accelerator's Facilities
    Ueta, Nobuko
    Pereira Engel, Wanda Gabriel
    XXXV BRAZILIAN WORKSHOP ON NUCLEAR PHYSICS, 2013, 1529 : 137 - 140
  • [4] Experimental improvement of 750-keV H- beam transport at LANSCE Accelerator Facility
    Batygin, Y. K.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2018, 904 : 64 - 73
  • [5] Monitoring of the accelerator beam distributions for internal target facilities
    Moskal, P
    Adam, HH
    Budzanowski, A
    Grzonka, D
    Jarczyk, L
    Khoukaz, A
    Kilian, K
    Kowina, P
    Lang, N
    Lister, T
    Oelert, W
    Quentmeier, C
    Santo, R
    Schepers, G
    Sefzick, T
    Sewerin, S
    Siemaszko, M
    Smyrski, J
    Strzalkowski, A
    Wolke, M
    Wüstner, P
    Zipper, W
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2001, 466 (03) : 448 - 455
  • [6] Wales Information Network: an overview of projects in progress
    Tomos, L
    Downes, D
    PROGRAM-ELECTRONIC LIBRARY AND INFORMATION SYSTEMS, 1997, 31 (03) : 281 - 285
  • [7] Tensile properties of candidate SNS target container materials after proton and neutron irradiation in the LANSCE accelerator
    Farrell, K
    Byun, TS
    JOURNAL OF NUCLEAR MATERIALS, 2001, 296 : 129 - 138
  • [8] Beam trips and target/subcritical reactor problems in accelerator driven facilities
    Bauer, GS
    Wydler, P
    Stanculescu, A
    Commetto, M
    PROCEEDINGS OF THE WORKSHOP ON UTILISATION AND RELIABILITY OF HIGH POWER PROTON ACCELERATORS, 1999, : 355 - 370
  • [9] Overview of the e-Fuels Market, Projects, and the State of the Art of Production Facilities
    Dybinski, Olaf
    Szablowski, Lukasz
    Martsinchyk, Aliaksandr
    Szczesniak, Arkadiusz
    Milewski, Jaroslaw
    Grzebielec, Andrzej
    Shuhayeu, Pavel
    ENERGIES, 2025, 18 (03)
  • [10] Overview of Ph.D. dissertations, projects and research papers that are in progress
    Adamantios Skordilis
    The International Journal of Life Cycle Assessment, 2000, 5 (2) : 72 - 72