Routing-based reactive scheduling policies for machine failures in dynamic job shops

被引:41
作者
Kutanoglu, E [1 ]
Sabuncuoglu, I
机构
[1] Univ Arkansas, Dept Ind Engn, Fayetteville, AR 72701 USA
[2] Bilkent Univ, Dept Ind Engn, TR-06533 Ankara, Turkey
关键词
D O I
10.1080/00207540110057909
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A scheduling and control system can be viewed as a vital component of modern manufacturing systems that determines companies' overall performance in their respective supply chains. This paper studies reactive scheduling policies developed against unexpected machine failures. These reactive policies are based on rerouting the jobs to their alternative machines when their primary machine fails. Depending on the subset of the jobs considered for rerouting, the long-term performance of four policies are tested under various conditions. Expecting that these rerouting policies would bring an extra load for a material-handling system (MHS), a dynamic job shop environment was studied with and without a MHS. It is shown that the proper selection of a good reactive policy is based not only on the system characteristics such as utilization, machine down times and frequency of machine failures, but also on the MHS capacity (in terms of speed and number of MH devices). The extensive experiments show that when the MHS is not a bottleneck and/or the down times are long enough to compensate the cost of extra rerouting, rerouting all affected jobs to their alternative machines proves to be the best policy. However, when the MHS cannot handle the extra load due to rerouting or the down times are relatively short, then rerouting only the jobs that will arrive to the failed machine during repair performs the best.
引用
收藏
页码:3141 / 3158
页数:18
相关论文
共 26 条
[1]  
AKTURK MS, 1998, EUROPEAN J OPERATION, V112, P80
[2]   MATCHUP SCHEDULING WITH MULTIPLE RESOURCES, RELEASE DATES AND DISRUPTIONS [J].
BEAN, JC ;
BIRGE, JR ;
MITTENTHAL, J ;
NOON, CE .
OPERATIONS RESEARCH, 1991, 39 (03) :470-483
[3]   Decomposition heuristics for robust job-shop scheduling [J].
Byeon, ES ;
Wu, SD ;
Storer, RH .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (02) :303-313
[4]   REACTING TO SCHEDULING EXCEPTIONS IN FMS ENVIRONMENTS [J].
DUTTA, A .
IIE TRANSACTIONS, 1990, 22 (04) :300-314
[5]  
Fox M. S., 1984, Expert Systems, V1, P25, DOI 10.1111/j.1468-0394.1984.tb00424.x
[6]  
HE Y, 1994, P 3 IND ENG RES C, P308
[7]  
JAIN S, 1987, P 1987 ASME INT COMP, P235
[8]  
KIM MH, 1994, J MANUF SYST, V13, P85, DOI 10.1016/0278-6125(94)90024-8
[9]   An analysis of heuristics in a dynamic job shop with weighted tardiness objectives [J].
Kutanoglu, E ;
Sabuncuoglu, I .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (01) :165-187
[10]  
KUTANOGLU E, 1995, P 4 IND ENG RES C, P904