Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times

被引:25
作者
Park, Taeho [1 ]
Lee, Taehyung [1 ]
Kim, Chang Ouk [1 ]
机构
[1] Yonsei Univ, Seoul 120749, South Korea
关键词
Parallel machine scheduling; Due date; Sequence-dependent major/minor setup times; Total tardiness; Job splitting; Heuristics; TARDINESS; PROPERTY; HEURISTICS; ALGORITHM; EARLINESS; COSTS;
D O I
10.1007/s00170-011-3489-x
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses job scheduling problems with parallel machines. To satisfy customers better in a manufacturing company, meeting due dates has been an important performance metric. Besides the numerous other factors affecting due date satisfaction, the splitting of a job through parallel machines can contribute to the reduction of production lead time, resulting in less job tardiness against their due dates. Thus, this paper presents heuristic algorithms for minimizing total tardiness of jobs to meet their due dates in a manufacturing shop with identically functioning machines. The algorithms take into account job splitting and sequence-dependent major/minor setup times. The performance of the proposed heuristics is compared with that of past three algorithms in the literature.
引用
收藏
页码:325 / 333
页数:9
相关论文
共 50 条
[21]   Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times [J].
Ezugwu, Absalom E. ;
Adeleke, Olawale J. ;
Viriri, Serestina .
PLOS ONE, 2018, 13 (07)
[22]   Scheduling the capacitated identical parallel machines problem: a new formulation with sequence-dependent setup costs and different due dates [J].
Esmaelian, Majid ;
Sobhani, Ahmad ;
Shahmoradi, Hadi ;
Mohammadi, Milad .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2021, 15 (05) :643-674
[23]   Minimising total tardiness for the identical parallel machine scheduling problem with splitting jobs and sequence-dependent setup times [J].
Kim, Jae-Gon ;
Song, Seokwoo ;
Jeong, BongJoo .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (06) :1628-1643
[24]   Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times [J].
Chen, Chun-Lung ;
Chen, Chuen-Lung .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2) :161-169
[25]   An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times [J].
Keskinturk, Timur ;
Yildirim, Mehmet B. ;
Barut, Mehmet .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (06) :1225-1235
[26]   Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints [J].
Lin, Shih-Wei ;
Lu, Chung-Cheng ;
Ying, Kuo-Ching .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4) :353-361
[27]   Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times [J].
Driessel, Rene ;
Moench, Lars .
COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (02) :336-345
[28]   Job scheduling for maximum revenue on uniform, parallel machines with major and minor setups and job splitting [J].
Chua, Geoffrey A. ;
Ravindran, Ashwin ;
Senga, Juan Ramon L. ;
Viswanathan, S. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 178
[29]   Genetic algorithm with initial sequence for parallel machines scheduling with sequence dependent setup times based on earliness- tardiness [J].
Khanh Van, Bui ;
Van Hop, Nguyen .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2021, 38 (01) :18-28
[30]   A high performing metaheuristic for job shop scheduling with sequence-dependent setup times [J].
Naderi, B. ;
Ghomi, S. M. T. Fatemi ;
Aminnayeri, M. .
APPLIED SOFT COMPUTING, 2010, 10 (03) :703-710