Research of the Lost Circulation Curing

被引:0
作者
Ivanova, Tanyana [1 ]
Korshunov, Aleksandr [1 ]
Koretskiy, Vladimir [2 ]
Issa, Nikola Abo [3 ]
机构
[1] Russian Acad Sci, Inst Mech, Ural Branch, Fed State Budgetary Inst Sci,Udmurt Fed Res Ctr, T Baramzinoy Str 34, Izhevsk 426000, Russia
[2] Kalashnikov Izhevsk State Tech Univ, Izhevsk, Udmurt Republic, Russia
[3] Damascus Univ, Fac Mech & Elect Engn, POB 86, Damascus, Syria
关键词
lost circulation; formation; drilling mud; geophysical method; cement plug;
D O I
10.46544/AMS.v26i3.15
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Accident-free construction of controlled directional and horizontal wells, as well as the use of an economically profitable and effective method of lost circulation curing, is an urgent problem. In order to opt for the optimal method for lost circulation curing, it is necessary to investigate the causes of losses and methods of studying the absorbing formation, analyze the experience of lost circulation control in the regions, and take up an economically profitable and effective method of lost circulation curing. The work identifies the factors impacting the occurrence of the drilling mud losses. Geophysical research methods are considered to study thief formations. The peculiarities of the considered methods and their economic analysis are given. The identified Selection Method for the measures to prevent and control fluid loss is based on quantitative criteria allowing for the geological structure and hydrodynamic characteristics of formations. The lost circulation curing based on placing cement plugs, the QUICK-STONETM technology, the lost circulation curing based on insulating compound chromium acetate are considered. The economic analysis of the considered methods is given. It has been found that the use of an insulating compound based on chromium acetate is 3.2 times more economical than QUICKSTONETM technology, as well as 1.4 times more than placing the cement plug.
引用
收藏
页码:582 / 592
页数:11
相关论文
共 20 条
[1]   EXPERT TECHNOLOGY FOR RISK MANAGEMENT IN THE IMPLEMENTATION OF QRM IN A HIGH-TECH INDUSTRIAL ENTERPRISE [J].
Akatov, Nikolay ;
Mingaleva, Zhanna ;
Klackova, Ivana ;
Galieva, Gulnara ;
Shaidurova, Nataliy .
MANAGEMENT SYSTEMS IN PRODUCTION ENGINEERING, 2019, 27 (04) :250-254
[2]  
American Petroleum Institute, 2010, IS POT FLOW ZON WELL
[3]  
Arjmand Y., 2017, MAT 4 INT C REC INN
[4]  
Basarygin Yu. M., 2001, OIL GAS WELL DRILLIN
[5]  
Basarygin Yu. M., 2000, COMPLICATIONS ACCIDE
[6]   CHARACTERIZATION AND DFN MODELLING OF THE FRACTURE NETWORK IN A MESOZOIC KARST RESERVOIR: GOMBA OILFIELD, PALEOGENE BASIN, CENTRAL HUNGARY [J].
Bauer, M. ;
Toth, T. M. .
JOURNAL OF PETROLEUM GEOLOGY, 2017, 40 (03) :319-334
[7]  
Bulatov A. I., 1999, DRILLING WASHING CEM
[8]   Utilization of strategies to generate and optimize machining sequences in CAD/CAM [J].
Dodok, Tomas ;
Cubonova, Nadezda ;
Cisar, Miroslav ;
Kuric, Ivan ;
Zajacko, Ivan .
12TH INTERNATIONAL SCIENTIFIC CONFERENCE OF YOUNG SCIENTISTS ON SUSTAINABLE, MODERN AND SAFE TRANSPORT, 2017, 192 :113-118
[9]  
Elbakian A, 2018, ACTA MONTAN SLOVACA, V23, P271
[10]  
Eremin A., 2013, SMART FIELDS WELLS T