A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran

被引:59
作者
Habibi, Farhad [1 ]
Barzinpour, Farnaz [1 ]
Sadjadi, Seyed Jafar [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran 1684613114, Iran
关键词
Project scheduling; Material procurement; Environmental considerations; Social impacts; Fuzzy inference system; Multi-objective optimization; EPSILON-CONSTRAINT METHOD; GENETIC ALGORITHM; INDICATORS; PERFORMANCE; FRAMEWORK;
D O I
10.1016/j.cie.2019.01.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the traditional project planning approach, the manager first schedules the project activities and then plans the material ordering timetable accordingly. But in this approach, the tradeoff and association between the project implementation costs and ordering expenses are disregarded. This approach is also ill-suited for modern organizations that are under growing public pressure to support inter and intra generational justice and introduce environmental and social objectives to their competitive strategy and business mission. This paper provides an integrated framework for the Project Scheduling and Material Ordering (PSMO) problem with sustainability considerations. The proposed framework consists of two phases: (a) quantifying the environmental and social merits of the potential suppliers of the project resources, and (b) constructing and solving a mathematical model based on the acquired data. The model is able to determine the activities schedule, material ordering time and quantity, and the supplier selection that maximize the project NPV and the environmental and social benefits of its suppliers. The presented model falls within the class of NP-Hard problems, so two multi-objective meta heuristic algorithms, namely NSGA-II and MOPSO were modified to serve as solution methods for this model. For small problems, the performance of these methods was compared with that of second version of the augmented e-constraint (AUGMECON2) method, but for larger problems, where the exact method was unable to produce a solution within a reasonable time, these two algorithms were compared with each other. The results showed that regardless of problem size, NSGA-II outperforms MOPSO in the majority of evaluation metrics. The paper also includes a case study conducted on the trackbed construction project in Section 5 of Mianeh-Bostanabad-Tabriz railway in Iran, which demonstrates the applicability of the proposed model and provide an illustrative example of its implementation.
引用
收藏
页码:690 / 710
页数:21
相关论文
共 48 条
[1]   A TOPSIS extension framework for re-conceptualizing sustainability measurement [J].
Afful-Dadzie, Anthony ;
Afful-Dadzie, Eric ;
Turkson, Charles .
KYBERNETES, 2016, 45 (01) :70-86
[2]   Toward a national sustainable building assessment system in Oman: Assessment categories and their performance indicators Muhannad [J].
Al-Jebouri, Muhannad F. A. ;
Saleh, Mohamed S. ;
Raman, Sudharshan N. ;
Rahmat, Riza Atiq Abdullah Bin O. K. ;
Shaaban, Awni K. .
SUSTAINABLE CITIES AND SOCIETY, 2017, 31 :122-135
[3]  
[Anonymous], 2017, SUSTAINABILITY BASEL, DOI DOI 10.3390/SU9040583
[4]  
Aquilano N.J., 1980, J OPER MANAG, V1, P57, DOI [10.1016/0272-6963(80)90013-3, DOI 10.1016/0272-6963(80)90013-3]
[5]   Sustainable supplier selection and order lot-sizing: an integrated multi-objective decision-making process [J].
Azadnia, Amir Hossein ;
Saman, Muhamad Zameri Mat ;
Wong, Kuan Yew .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (02) :383-408
[6]   Applications of the extent analysis method on fuzzy AHP [J].
Chang, DY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (03) :649-655
[7]   Symbiotic Organisms Search: A new metaheuristic optimization algorithm [J].
Cheng, Min-Yuan ;
Prayogo, Doddy .
COMPUTERS & STRUCTURES, 2014, 139 :98-112
[8]  
Coello CAC, 2004, IEEE T EVOLUT COMPUT, V8, P256, DOI [10.1109/TEVC.2004.826067, 10.1109/tevc.2004.826067]
[9]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[10]   Integration of equipment planning and project scheduling [J].
Dodin, B. ;
Elimam, A. A. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (03) :962-980