Hybrid cost and time path planning for multiple autonomous guided vehicles

被引:77
作者
Fazlollahtabar, Hamed [1 ]
Hassanli, Samaneh [2 ]
机构
[1] Damghan Univ, Dept Ind Engn, Coll Engn, Damghan, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
关键词
Scheduling; Routing; Autonomous guided vehicles (AGVs); Path planning; Network simplex algorithm (NSA); ALGORITHM; ROBOTS;
D O I
10.1007/s10489-017-0997-x
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, simultaneous scheduling and routing problem for autonomous guided vehicles (AGVs) is investigated. At the beginning of the planning horizon list of orders is processed in the manufacturing system. The produced or semi-produced products are carried among stations using AGVs according to the process plan and the earliest delivery time rule. Thus, a network of stations and AGV paths is configured. The guide path is bi-direction and AGVs can only stop at the end of a node. Two kinds of collisions exist namely: AGVs move directly to a same node and AGVs are on a same path. Delay is defined as an order is carried after the earliest delivery time. Therefore, the problem is defined to consider some AGVs and material handling orders available and assign orders to AGVs so that collision free paths as cost attribute and minimal waiting time as time attribute, are obtained. Solving this problem leads to determine: the number of required AGVs for orders fulfillment assign orders to AGVs schedule delivery and material handling and route different AGVs. The problem is formulated as a network mathematical model and optimized using a modified network simplex algorithm. The proposed mathematical formulation is first adapted to a minimum cost flow (MCF) model and then optimized using a modified network simplex algorithm (NSA). Numerical illustrations verify and validate the proposed modelling and optimization. Also, comparative studies guarantee superiority of the proposed MCF-NSA solution approach.
引用
收藏
页码:482 / 498
页数:17
相关论文
共 23 条
[1]  
[Anonymous], 2012, Robot motion planning
[2]  
Das P. K., 2016, Journal of Electrical Systems and Information Technology, V3, P295, DOI 10.1016/j.jesit.2015.12.003
[3]   A hybrid improved PSO-DV algorithm for multi-robot path planning in a clutter environment [J].
Das, P. K. ;
Behera, H. S. ;
Das, Swagatam ;
Tripathy, H. K. ;
Panigrahi, B. K. ;
Pradhan, S. K. .
NEUROCOMPUTING, 2016, 207 :735-753
[4]   Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs [J].
Drobouchevitch, Inna G. ;
Sidney, Jeffrey B. .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (09) :1919-1926
[5]  
Fazlollahtabar H., 2015, Autonomous Guided Vehicles: Methods and Models for Optimal Path Planning
[6]   Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms [J].
Fazlollahtabar, Hamed ;
Saidi-Mehrabad, Mohammad ;
Balakrishnan, Jaydeep .
ROBOTICS AND AUTONOMOUS SYSTEMS, 2015, 72 :131-138
[7]   Mathematical model for deadlock resolution in multiple AGV scheduling and routing network: a case study [J].
Fazlollahtabar, Hamed ;
Saidi-Mehrabad, Mohammad ;
Masehian, Ellips .
INDUSTRIAL ROBOT-THE INTERNATIONAL JOURNAL OF ROBOTICS RESEARCH AND APPLICATION, 2015, 42 (03) :252-263
[8]   Methodologies to Optimize Automated Guided Vehicle Scheduling and Routing Problems: A Review Study [J].
Fazlollahtabar, Hamed ;
Saidi-Mehrabad, Mohammad .
JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 2015, 77 (3-4) :525-545
[9]   A cross-entropy heuristic statistical modeling for determining total stochastic material handling time [J].
Fazlollahtabar, Hamed ;
Olya, Mohammad Hessam .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (5-8) :1631-1641
[10]   Producer's behavior analysis in an uncertain bicriteria AGV-based flexible jobshop manufacturing system with expert system [J].
Fazlollahtabar, Hamed ;
Mahdavi-Amiri, Nezam .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (9-12) :1605-1618