Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments

被引:32
作者
Chiu, Yuan-Shyi Peter [2 ]
Liu, Shang-Chih [2 ]
Chiu, Chun-Lin [2 ]
Chang, Huei-Hsin [1 ]
机构
[1] Chaoyang Univ Technol, Dept Finance, Taichung 413, Taiwan
[2] Chaoyang Univ Technol, Dept Ind Engn & Management, Taichung 413, Taiwan
关键词
Mathematical modelling; Production systems; Replenishment policy; EMQ model; Lot size; Multiple shipments; Random defective; Imperfect rework; OPTIMAL BATCH SIZE; PRODUCTION SYSTEM; IMPERFECT QUALITY; SINGLE-VENDOR; QUANTITY;
D O I
10.1016/j.mcm.2011.05.025
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper uses mathematical modeling to determine optimal inventory replenishment policy for the economic manufacturing quantity (EMQ) with rework and multiple shipments. The classic EMQ model considers a continuous inventory issuing policy for satisfying customer's demands. It also assumes that all products produced are of perfect quality. However, in a real world vendor-buyer integrated environment, multi-shipment policy is practically used in lieu of the continuous issuing approach and generation of random defective items is inevitable. In this study, we assume the reworking of all defective items takes place when the regular production process ends in each cycle. Failure in repair exists; a portion of reworked items fails during the reworking and becomes scrap. The finished items can only be delivered to customers if the whole lot is quality assured at the end of rework. Fixed quantity multiple installments of the finished batch are delivered to customers at a fixed interval of time. Mathematical modeling and analysis are employed in this study for solving such a realistic EMQ model. The long-run average cost function is derived, its convexity is proved, and a closed-form optimal manufacturing lot size is obtained. Two special cases to the proposed model are examined. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2165 / 2174
页数:10
相关论文
共 32 条
[1]  
Aggarwal S.C., 1974, International Journal of Production Research, V12, P443
[2]  
[Anonymous], 1965, MATH THEORY RELIABIL
[3]  
[Anonymous], PRODUCTION OPERATION
[4]   Integrated single vendor single buyer model with stochastic demand and variable lead time [J].
Ben-Daya, M ;
Hariga, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 92 (01) :75-80
[5]   PRODUCTION-INVENTORY SYSTEMS WITH UNRELIABLE MACHINES [J].
BERG, M ;
POSNER, MJM ;
ZHAO, H .
OPERATIONS RESEARCH, 1994, 42 (01) :111-118
[6]   The impact of imperfect processes on production run times [J].
Boone, T ;
Ganeshan, R ;
Guo, YM ;
Ord, JK .
DECISION SCIENCES, 2000, 31 (04) :773-787
[7]   Optimal production lot sizing with rework, scrap rate, and service level constraint [J].
Chiu, Singa Wang ;
Ting, Chia-Kuan ;
Chiu, Yuan-Shyi Peter .
MATHEMATICAL AND COMPUTER MODELLING, 2007, 46 (3-4) :535-549
[8]   Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown [J].
Chiu, Singa Wang ;
Chen, Kuang-Ku ;
Yang, Jyh-Chau .
MATHEMATICAL AND COMPUTER MODELLING OF DYNAMICAL SYSTEMS, 2009, 15 (03) :255-274
[9]   ECONOMIC MANUFACTURING QUANTITY IN A JUST-IN-TIME DELIVERY SYSTEM [J].
GOLHAR, DY ;
SARKER, BR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (05) :961-972
[10]   INTEGRATED INVENTORY MODEL FOR A SINGLE SUPPLIER SINGLE CUSTOMER PROBLEM [J].
GOYAL, SK .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (01) :107-111