A model predictive control approach for real-time optimization of reentrant manufacturing lines

被引:29
作者
Vargas-Villamil, FD [1 ]
Rivera, DE [1 ]
机构
[1] Arizona State Univ, Dept Chem & Mat Engn, Control Syst Engn Lab, Tempe, AZ 85287 USA
关键词
reentrant line; model predictive control; real-time optimization; semiconductor manufacturing; discrete event system; fluid approximation;
D O I
10.1016/S0166-3615(01)00080-X
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A two layer hierarchical framework for optimization, control, and scheduling of semi-conductor reentrant lines is proposed. In this framework, model predictive control (MPC) is used at the top layer for real-time optimization (RTO). This layer acts as an interface between long-term planning (months) and scheduling (minutes). An l(1)-norm MPC, which uses a discrete linear model, addresses the long-term (shifts) inventory control problem while minimizing cycle time. It can also address the inventory and production control problems. The receding horizon feature of MPC allows the algorithm to simultaneously act as a long-term optimizer and as a controller. This algorithm is implemented as a linear programming (LP) problem, which is solved at the beginning of each shift. At the lower level, a variable priority policy (VPP) tracks the commands generated by the optimizer/controller providing the detailed operation of the discrete event fabrication line. The approach is illustrated with a case study of a five-machine, six-step line example developed by Intel. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:45 / 57
页数:13
相关论文
共 20 条
[1]  
AARDAL MR, 1998, P AEC APC S 10 VAIL, V795
[2]   A STUDY OF THE CONTINUOUS-FLOW MODEL OF PRODUCTION LINES WITH UNRELIABLE MACHINES AND FINITE BUFFERS [J].
ALVAREZVARGAS, R ;
DALLERY, Y ;
DAVID, R .
JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (03) :221-234
[3]   A NEW CONTINUOUS MODEL FOR JOB-SHOP SCHEDULING [J].
ANDERSON, EJ .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1981, 12 (12) :1469-1475
[4]  
Dallery Y., 1992, Queueing Systems Theory and Applications, V12, P3, DOI 10.1007/BF01158636
[5]  
ELADL MK, 1997, P 35 C DEC CONTR KOB, V1736
[6]   ROBUST STABILITY ANALYSIS OF CONSTRAINED L(1)-NORM MODEL-PREDICTIVE CONTROL [J].
GENCELI, H ;
NIKOLAOU, M .
AICHE JOURNAL, 1993, 39 (12) :1954-1965
[7]  
KAVEH F, 1998, P AEC APC S 10 VAIL, V41
[8]  
KEMPF K, 1997, COMMUNICATION
[9]  
KEMPF KG, 1996, P WINT SIM C COR ISL
[10]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227