Study on constraint scheduling algorithm for job shop problems with multiple constraint machines

被引:5
|
作者
Zuo, Yan [1 ]
Gu, Hanyu [1 ]
Xi, Yugeng [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Automat, Sch Elect Informat & Elect Engn, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
scheduling; job shop; constraint machine; shifting bottle neck;
D O I
10.1080/00207540701324143
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on a job-shop scheduling problem with multiple constraint machines (JSPMC). A constraint scheduling method for the JSPMC is proposed. It divides the machines in the shop into constraint and non-constraint machines based on a new identification method, and formulates a reduced problem only for constraint machines while replacing the operations of non-constraint machines with time lags. The constraint machines are scheduled explicitly by solving the reduced problem with an efficient heuristic, while the non-constraint machines are scheduled by the earliest operation due date (EODD) dispatching rule. Extensive computational results indicate that the proposed constraint scheduling algorithm can obtain a better trade-off between solution quality and computation time compared with various versions of the shifting bottleneck (SB) methods for the JSPMC.
引用
收藏
页码:4785 / 4801
页数:17
相关论文
共 50 条
  • [31] Flexible job shop scheduling with parallel machines using Genetic Algorithm and Grouping Genetic Algorithm
    Chen, James C.
    Wu, Cheng-Chun
    Chen, Chia-Wen
    Chen, Kou-Huang
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (11) : 10016 - 10021
  • [32] Constraint satisfaction for planning and scheduling problems
    Roman Barták
    Miguel A. Salido
    Constraints, 2011, 16
  • [33] Constraint satisfaction for planning and scheduling problems
    Bartak, Roman
    Salido, Miguel A.
    CONSTRAINTS, 2011, 16 (03) : 223 - 227
  • [34] DESIGN AND IMPLEMENTATION OF A MULTIPLE AGV SCHEDULING ALGORITHM FOR A JOB-SHOP
    Zhao, X. F.
    Liu, H. Z.
    Lin, S. X.
    Chen, Y. K.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (01) : 134 - 145
  • [35] An improved DNA evolutionary Algorithm for job shop scheduling
    Niu, Qun
    Gu, Xingsheng
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 6694 - +
  • [36] A hybrid evolutionary algorithm for the job shop scheduling problem
    Zobolas, G. I.
    Tarantilis, C. D.
    Ioannou, G.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (02) : 221 - 235
  • [37] Differential Evolution Algorithm for Job Shop Scheduling Problem
    Wisittipanich, Warisa
    Kachitvichyanukul, Voratas
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2011, 10 (03): : 203 - 208
  • [38] A hybrid genetic algorithm for the job shop scheduling problem
    Gonçalves, JF
    Mendes, JJDM
    Resende, MGC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) : 77 - 95
  • [39] Job shop scheduling considering multiple AGVs with charging
    Li Z.
    Liu Y.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2021, 27 (10): : 2872 - 2879
  • [40] Job shop scheduling problem with alternative machines using genetic algorithms
    Chaudhry, I. A.
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (05) : 1322 - 1333