Productivity Study of Microtunneling Pipe Installation Using Simulation

被引:17
|
作者
Luo, Roy Yu [1 ]
Najafi, Mohammad [2 ]
机构
[1] Michigan State Univ, Sch Planning Design & Construct, Construct Management Program, E Lansing, MI 48824 USA
[2] Univ Texas Arlington, Dept Civil & Environm Engn, Ctr Underground Infrastruct Res & Educ CUIRE, Arlington, TX 76019 USA
关键词
Microtunneling; Productivity; Simulation; Regression analysis; Trenchless technology; Pipes;
D O I
10.1061/(ASCE)1076-0342(2007)13:3(247)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Microtunneling is a complex operation that requires the integration of several systems, a variety of supporting equipments and personnel, and is heavily influenced by subsurface condition. The objective of this research is to analyze and evaluate the factors that affect the productivity in microtunneling operations. Computer simulation can be used to study microtunneling operations before they are actually performed, thereby identifying operational inefficiency at different stages of the project and finding soil impact on the productivity. For this research, an actual microtunneling field study conducted at Louisiana Tech University was selected. Based on the data collected during this field study, a cyclic operations network model was developed with consideration on the impact of variations in soil compositions on the productivity of the operation. Simulations were repetitively conducted with different soil compositions. The simulation results were studied with regression analysis. A linear function of productivity and soil compositions was found. Various combinations of resources were also simulated. In this research study, the hypothesis that microtunneling boring machine is the bottleneck of the operation was proved to be true, whereas labor resources were found to be secondary limitations.
引用
收藏
页码:247 / 260
页数:14
相关论文
共 50 条
  • [1] Risk level problems affecting microtunneling projects installation
    Salem, Dalia
    Elwakil, Emad
    Hegab, Mohamed
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2017, 44 (12) : 1014 - 1021
  • [2] Ranking of the Factors Affecting Productivity of Microtunneling Projects
    Hegab, Mohamed Y.
    Salem, Ossama M.
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2010, 1 (01) : 42 - 52
  • [3] Developments and research directions in pipe jacking and microtunneling
    Sterling, Raymond L.
    UNDERGROUND SPACE, 2020, 5 (01) : 1 - 19
  • [4] Modeling Microtunneling Projects using Computer Simulation
    Marzouk, Mohamed
    Abdallah, Moatassem
    El-Said, Moheeb
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 670 - 682
  • [5] A hybrid simulation approach for microtunneling construction planning
    Moharrami, Saeid
    Taghaddos, Maedeh
    RazaviAlavi, SeyedReza
    AbouRizk, Simaan
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (03): : 363 - 378
  • [6] Experimental and Analytical Study of Jacking Load during Microtunneling Gongbei Tunnel Pipe Roof
    Shi, Peixin
    Liu, Wei
    Pan, Jianli
    Yu, Caicheng
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2018, 144 (01)
  • [7] Comparison of different methods for normal stress calculation during pipe jacking/microtunneling
    Khondoker, Md. Tareq Hossain
    Yi, Yaolin
    Bayat, Alireza
    INTERNATIONAL JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 10 (04) : 366 - 376
  • [8] Toward Smart and Sustainable Infrastructure Solution: Assessment and Modelling of Qualitative Factors Affecting Productivity in Microtunneling Projects
    Elwakil, Emad
    Hegab, Mohamed
    2020 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2020,
  • [9] Improving Productivity in Food Processing Industries Using Simulation - A Case Study
    Abed, Seraj Yousef
    NEW ASPECTS OF SYSTEMS, PTS I AND II, 2008, : 596 - +
  • [10] Predicting construction productivity using situation-based simulation models
    Choy, Eldon
    Ruwanpura, Janaka Y.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2006, 33 (12) : 1585 - 1600