A Pareto Multi-Objective Optimization Approach for Solving Time-Cost-Quality Tradeoff Problems

被引:11
作者
Diao, Xundi [2 ]
Li, Heng [1 ]
Zeng, Saixing [2 ]
Tam, Vivian W. Y. [3 ]
Guo, Hongling [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[2] Shanghai Jiao Tong Univ, Antai Sch Management, Shanghai 200052, Peoples R China
[3] Univ Western Sydney, Sch Engn, Penrith, NSW 1797, Australia
关键词
Time-cost-quality; tradeoff; Pareto optimal set; project management; genetic algorithm; SORTING GENETIC ALGORITHM; OFF PROBLEM; CONSTRUCTION PROJECTS; DISCRETE-TIME; MODELS; CONSTRAINTS; MANAGEMENT; GA;
D O I
10.3846/13928619.2011.553988
中图分类号
F [经济];
学科分类号
02 ;
摘要
Speeding up a project's duration will definitely increase the cost and decrease the quality. The previous literatures were mainly related to project planning and controlling which mainly focus on cost-time tradeoff. However, limited researches have been referred to project quality based on mathematical methodologies. This paper proposes a tradeoff problem on time-cost-quality performance. A computer-based Pareto multi-objective optimization approach is utilized for solving the tradeoff problems. The approach can help searching near the reality Pareto-optimal set while not receiving any information on the stakeholders' preference for time, cost and quality. Based on the developed approach, decision-making can become easy according to the sorted non-dominated solutions and project preferences.
引用
收藏
页码:22 / 41
页数:20
相关论文
共 40 条
[1]   THE USE OF EXPLORATORY TUNNELS AS A TOOL FOR SCHEDULING AND COST ESTIMATION [J].
Abdallah, Ahmed .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2007, 13 (04) :280-287
[2]  
[Anonymous], EVOLUT COMPUT
[3]  
[Anonymous], 1993, EVOLUTION SEARCH OPT
[4]   Project management with time, cost, and quality considerations [J].
Babu, AJG ;
Suresh, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :320-327
[5]   On self-adaptive features in real-parameter evolutionary algorithms [J].
Beyer, HG ;
Deb, K .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2001, 5 (03) :250-270
[6]  
Blaszczyk B., 2009, DEVELOPMENT, V15, P523, DOI [10.3846/1392-8619.2009.15.523-539, DOI 10.3846/1392-8619.2009.15.523-539]
[7]   A time-cost trade-off model with resource consideration using genetic algorithm [J].
Chua, DKH ;
Chan, WT ;
Govindan, K .
CIVIL ENGINEERING SYSTEMS, 1997, 14 (04) :291-311
[8]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[9]   NONLINEAR TIME COST TRADEOFF MODELS IN PROJECT-MANAGEMENT [J].
DECKRO, RF ;
HEBERT, JE ;
VERDINI, WA ;
GRIMSRUD, PH ;
VENKATESHWAR, S .
COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 28 (02) :219-229
[10]  
Dev K., 1995, OPTIMAL ENG DESIGN A