Joint maintenance-inventory optimisation of parallel production systems

被引:27
|
作者
Zahedi-Hosseini, Farhad [1 ]
Scarf, Philip [2 ]
Syntetos, Aris [3 ]
机构
[1] Univ Salford, Sch Comp Sci & Engn, Manchester M5 4WT, Lancs, England
[2] Univ Salford, Salford Business Sch, Manchester M5 4WT, Lancs, England
[3] Cardiff Univ, Cardiff Business Sch, Panalpina Ctr Mfg & Logist Res, Cardiff CF10 3EU, S Glam, Wales
关键词
Maintenance; Inventory; Parallel production; Delay-Time; Spare parts; Simulation; SPARE-PROVISIONING POLICY; DELAY-TIME MODEL; PREVENTIVE MAINTENANCE; BLOCK-REPLACEMENT; GENETIC ALGORITHMS; MULTIUNIT SYSTEMS; DECISION-MAKING; PARTS INVENTORY; INSPECTION; SIMULATION;
D O I
10.1016/j.jmsy.2018.06.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We model a joint inspection and spare parts inventory policy for maintaining machines in a parallel system, where simultaneous downtime seriously impacts upon production performance and has a significant financial consequence. This dependency between system components means that analysis of realistic maintenance models is intractable. Therefore we use simulation and a numerical optimisation tool to study the cost-optimality of several policies. Inspection maintenance is modelled using the delay-time concept. Critical spare parts replenishment is considered using several variants of a periodic review policy. In particular, our results indicate that the cost-optimal policy is characterised by equal frequencies of inspection and replenishment, and delivery of spare parts that coincides with maintenance intervention. In general, our model provides a framework for studying the interaction of spare parts ordering with maintenance scheduling. The sensitivity analysis that we present offers insights for the effective management of such parallel systems, not only in a paper-making plant, which motivates our modelling development, but also in other manufacturing contexts.
引用
收藏
页码:73 / 86
页数:14
相关论文
empty
未找到相关数据