Analysis of surface and wellbore hydraulics provides key to efficient blowout control

被引:2
|
作者
Oudeman, P [1 ]
机构
[1] Shell Int Explorat & Prod BV, Ctr Res & Tech Serv, Rijswijk, Netherlands
关键词
D O I
10.2118/51179-PA
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Assessment of blowout rate and composition is a key issue for decisions concerning blowout control method, design of kill operations, determination of direct (e.g., environmental) and indirect (loss of reserves) damage, etc. Usually, loss of control over the outflow of the well implies that the blowout rate cannot be established with conventional means. Experience shows that, because of the large reservoir decompression, production well performance cannot be extrapolated reliably to blowout conditions. Hence, surface (simple) observations, such as wellhead/drillpipe pressure and temperature, effluent shape and size and noise field, results of previous kill attempts, and pressure response of nearby wells have to be interpreted in terms of the blowout rate. This paper presents two examples of blowouts for which the combination of such data led to a consistent and accurate picture of blowout well performance; it also describes how such estimates contributed to decisions concerning the kill strategy, leading to success in a relatively short time.
引用
收藏
页码:163 / 173
页数:11
相关论文
共 50 条
  • [1] PRACTICAL HYDRAULICS - A KEY TO EFFICIENT DRILLING
    BROUSE, M
    WORLD OIL, 1982, 195 (05) : 81 - 84
  • [2] HYDRAULICS PROVIDES TIGHT CONTROL OF PAPER COATINGS.
    Wiseman, R.
    Hydraulics and Pneumatics, 1987, 40 (08): : 69 - 71
  • [3] WELLBORE AND NEAR-SURFACE HYDRAULICS OF A BLOWN-OUT OIL WELL
    CLARK, AR
    PERKINS, TK
    JOURNAL OF PETROLEUM TECHNOLOGY, 1981, 33 (11): : 2181 - 2188
  • [4] Guidelines for efficient wellbore stability analysis
    CSIRO Petroleum, Australian Petroleum Coop Res Cntre, Melbourne VC 3150, Australia
    Int J Rock Mech Min Sci, 3-4 (418):
  • [5] Guidelines for efficient wellbore stability analysis
    Australian Petroleum Cooperative Research Centre, CSIRO Petroleum, Melbourne
    Victoria
    3150, Australia
    不详
    Victoria
    3168, Australia
    Int. J. Rock Mech. Min. Sci., 3-4 (50.e1-50.e14):
  • [6] HYDRAULICS PROVIDES LOW-EFFORT CONTROL FOR FRONT END LOADER
    WILSON, HR
    SCHANTZ, RK
    HYDRAULICS & PNEUMATICS, 1975, 28 (06) : 62 - 64
  • [7] BLOCKWARE PROVIDES KEY TO CONTROL VERSATILITY
    MARSH, P
    CONTROL AND INSTRUMENTATION, 1984, 16 (04): : 29 - &
  • [8] Modeling the key factors that could influence the diffusion of CO2 from a wellbore blowout in the Ordos Basin, China
    Qi Li
    Hui Shi
    Duoxing Yang
    Xiaochen Wei
    Environmental Science and Pollution Research, 2017, 24 : 3727 - 3738
  • [9] Modeling the key factors that could influence the diffusion of CO2 from a wellbore blowout in the Ordos Basin, China
    Li, Qi
    Shi, Hui
    Yang, Duoxing
    Wei, Xiaochen
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2017, 24 (04) : 3727 - 3738
  • [10] SAFETY PROVIDES THE KEY TO QUALITY-CONTROL
    不详
    APPLIED ERGONOMICS, 1993, 24 (04) : 300 - 301