Using simulation to evaluate the assembly line balancing solutions proposed by heuristic algorithms under stochastic task times

被引:0
作者
Genikomsakis, K. N. [1 ]
Tourassis, V. D. [1 ]
机构
[1] Democritus Univ Thrace, Sch Engn, Grad Program Syst Engn & Management, GR-67100 Xanthi, Greece
来源
MANAGEMENT OF TECHNOLOGICAL CHANGES, BOOK 2 | 2007年
关键词
assembly line balancing; balancing index; manufacturing simulation;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this work, a benchmark assembly line balancing problem is solved by using heuristic procedures that are commonly used in industry and broadly represent the two main families of commercial algorithms, namely COMSOAL procedures and genetic algorithms. Then, considering stochastic task times, the proposed solutions are implemented via a simulation testbed in order to examine the effect of the variability of the task times on the number of finished products for a given simulation time (sensitivity analysis). The results show that existing line balancing indexes do not characterize the quality of the proposed solutions very effectively when stochastic variations in task times are taken into consideration. At this level, simulation appears to be a reliable tool for decision making in assembly line design and task assignment to workstations, as it represents the actual characteristics of an assembly line more effectively.
引用
收藏
页码:23 / 29
页数:7
相关论文
共 11 条
[1]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[2]   A survey on problems and methods in generalized assembly line balancing [J].
Becker, C ;
Scholl, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :694-715
[3]   The definition of assembly line balancing difficulty and evaluation of balance solution quality [J].
Driscoll, J ;
Thilakawardana, D .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2001, 17 (1-2) :81-86
[4]   A survey of the assembly line balancing procedures [J].
Erel, E ;
Sarin, SC .
PRODUCTION PLANNING & CONTROL, 1998, 9 (05) :414-434
[5]  
GENIKOMSAKIS K, 2005, THESIS DEMOCRITUS U
[6]   Simulation integration in manufacturing system development:: a study of Japanese industry [J].
Holst, L ;
Bolmsjö, G .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2001, 101 (07) :339-356
[7]   A BRANCH AND BOUND ALGORITHM FOR ASSEMBLY LINE BALANCING PROBLEMS WITH FORMULATION IRREGULARITIES [J].
JOHNSON, RV .
MANAGEMENT SCIENCE, 1983, 29 (11) :1309-1324
[8]   A comparative evaluation of assembly line balancing heuristics [J].
Ponnambalam, SG ;
Aravindan, P ;
Naidu, GM .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1999, 15 (08) :577-586
[9]   State of art of optimization methods for assembly line design [J].
Rekiek, Brahim ;
Dolgui, Alexandre ;
Delchambre, Alain ;
Bratcu, Antoneta .
Annual Reviews in Control, 2002, 26 II :163-174
[10]  
Salveson M.E., 1955, The Journal of Industrial Engineering, V6, P18