A Re-entrant Flowshop Heuristic for Online Scheduling of the Paper Path in a Large Scale Printer

被引:0
|
作者
Waqas, Umar [1 ]
Geilen, Marc [1 ]
Kandelaars, Jack [2 ]
Somers, Lou [2 ]
Basten, Twan [1 ]
Stuijk, Sander [1 ]
Vestjens, Patrick [2 ]
Corporaal, Henk [1 ]
机构
[1] Eindhoven Univ Technol, Dept Elect Engn, Eindhoven, Netherlands
[2] Oce Technol, Res & Dev, Venlo, Netherlands
关键词
SEQUENCING PROBLEM; M-MACHINE; N-JOB; ALGORITHM; SETUPS; SHOP;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
A Large Scale Printer (LSP) is a Cyber Physical System (CPS) printing thousands of sheets per day with high quality. The print requests arrive at run-time requiring online scheduling. We capture the LSP scheduling problem as online scheduling of re-entrant flowshops with sequence dependent setup times and relative due dates with makespan minimization as the scheduling criterion. Exhaustive approaches like Mixed Integer Programming can be used, but they are compute intensive and not suited for online use. We present a novel heuristic for scheduling of LSPs that on average requires 0.3 seconds per sheet to find schedules for industrial test cases. We compare the schedules to lower bounds, to schedules generated by the current scheduler and schedules generated by a modified version of the classical NEH (MNEH) heuristic [1], [2]. On average, the proposed heuristic generates schedules that are 40% shorter than the current scheduler, have an average difference of 25% compared to the estimated lower bounds and generates schedules with less than 67% of the makespan of schedules generated by the MNEH heuristic.
引用
收藏
页码:573 / 578
页数:6
相关论文
共 50 条
  • [1] A Heuristic for Variable Re-Entrant Scheduling Problems
    van der Tempel, Roel
    van Pinxten, Joost
    Geilen, Marc
    Waqas, Umar
    2018 21ST EUROMICRO CONFERENCE ON DIGITAL SYSTEM DESIGN (DSD 2018), 2018, : 336 - 341
  • [2] Lagrangian Relaxation algorithms for re-entrant hybrid flowshop scheduling
    Jiang, Shujun
    Tang, Lixin
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, 2008, : 78 - 81
  • [3] Re-Entrant Flowshop Scheduling With Learning Considerations to Minimize The Makespan
    Wu, Chin-Chia
    Liu, Shang-Chia
    Cheng, T. C. E.
    Cheng, Yu
    Liu, Shi-Yuan
    Lin, Win-Chin
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION A-SCIENCE, 2018, 42 (A2): : 727 - 744
  • [4] Re-Entrant Flowshop Scheduling With Learning Considerations to Minimize The Makespan
    Chin-Chia Wu
    Shang-Chia Liu
    T. C. E. Cheng
    Yu Cheng
    Shi-Yuan Liu
    Win-Chin Lin
    Iranian Journal of Science and Technology, Transactions A: Science, 2018, 42 : 727 - 744
  • [5] Solving Re-entrant No-wait Flowshop Scheduling Problem
    Hassanpour, S. Tasouji
    Amin-Naseri, M. R.
    Nahavandi, N.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2015, 28 (06): : 903 - 912
  • [6] Heuristic based genetic algorithms for the re-entrant total completion time flowshop scheduling with learning consideration
    Jianyou Xu
    Win-Chin Lin
    Junjie Wu
    Shuenn-Ren Cheng
    Zi-Ling Wang
    Chin-Chia Wu
    International Journal of Computational Intelligence Systems, 2016, 9 : 1082 - 1100
  • [7] New heuristic for scheduling re-entrant production lines
    Yalaoui, Naim
    Camara, Mema
    Amodeo, Lionel
    Yalaoui, Farouk
    Mahdi, Halim
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 199 - +
  • [8] Heuristic based genetic algorithms for the re-entrant total completion time flowshop scheduling with learning consideration
    Xu, Jianyou
    Lin, Win-Chin
    Wu, Junjie
    Cheng, Shuenn-Ren
    Wang, Zi-Ling
    Wu, Chin-Chia
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2016, 9 (06) : 1082 - 1100
  • [9] Heuristic algorithms for two-machine re-entrant flowshop scheduling problem with jobs of two classes
    Jeong, BongJoo
    Shim, Sang-Oh
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2017, 11 (05):
  • [10] Scheduling multiple robots in a no-wait re-entrant robotic flowshop
    Che, Ada
    Chabrol, Michelle
    Gourgand, Michel
    Wang, Yuan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (01) : 199 - 208