Study on framework of construction project management maturity model

被引:0
作者
Zhai Fengyong [1 ]
Liu Renhui [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
来源
2007 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1-3 | 2007年
关键词
construction project management maturity model (CPM3); questionnaire; assessment; improvement;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.
引用
收藏
页码:1180 / +
页数:2
相关论文
共 50 条
[31]   An Online Transparency for Accountability Maturity Model [J].
Lourenco, Rui Pedro ;
Serra, Leila .
ELECTRONIC GOVERNMENT (EGOV 2014), 2014, 8653 :35-46
[32]   New service development maturity model [J].
Jin, Dayu ;
Chai, Kah-Hin ;
Tan, Kay-Chuan .
MANAGING SERVICE QUALITY, 2014, 24 (01) :86-116
[33]   A maturity assessment model for manufacturing systems [J].
Vivares, Jorge A. ;
Sarache, William ;
Hurtado, Jorge E. .
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2018, 29 (05) :746-767
[34]   PMMM Kerzner Questionnaire Validation for Project Management Maturity Level Assessment: One of the Largest Indonesia's State-Owned Bank [J].
Hutabarat, Novalina ;
Raharjo, Teguh ;
Hardian, Bob ;
Suhanto, Agus ;
Wahbi, Andi .
13TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER SCIENCE AND INFORMATION SYSTEMS (ICACSIS 2021), 2021, :151-+
[35]   Maturity assessment: towards continuous improvements for project-based organisations? [J].
Backlund, Fredrik ;
Chroneer, Diana ;
Sundqvist, Erik .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2015, 8 (02) :256-278
[36]   HCI in practice: An empirical study with software process capability maturity model consultants in Brazil [J].
Goncalves, Taisa Guidini ;
de Oliveira, Kathia Marcal ;
Kolski, Christophe .
JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2018, 30 (11)
[37]   Study on Framework and Structure Model of Dynamic Financial Analysis [J].
Guo, Liping .
INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, :1796-1799
[38]   PROJECT MATURITY OF ORGANIZATIONS IMPLEMENTING RESEARCH PROJECTS - PREPARING FOR QUESTIONNAIRE RESEARCH [J].
Klaus-Rosinska, Agata ;
Betta, Jan .
CBU INTERNATIONAL CONFERENCE PROCEEDINGS 2017: INNOVATIONS IN SCIENCE AND EDUCATION, 2017, 5 :656-659
[39]   eGovernment Project Evaluation: An Integrated Framework [J].
Liu, Jianwei ;
Derzsi, Zsofia ;
Raus, Marta ;
Kipp, Alexander .
ELECTRONIC GOVERNMENT, PROCEEDINGS, 2008, 5184 :85-+
[40]   Construction industry competitiveness: An analysis framework with application to China construction [J].
Li Xianguang ;
Li Qiming ;
Wu Wenxian ;
Wang Wenxiong .
PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, :531-543