Study on framework of construction project management maturity model

被引:0
作者
Zhai Fengyong [1 ]
Liu Renhui [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
来源
2007 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1-3 | 2007年
关键词
construction project management maturity model (CPM3); questionnaire; assessment; improvement;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.
引用
收藏
页码:1180 / +
页数:2
相关论文
共 50 条
[21]   Assessment of Quality Management System Maturity [J].
Grabowska, Marta ;
Takala, Josu .
ADVANCES IN MANUFACTURING (MANUFACTURING 2017), 2018, :889-898
[22]   A Maturity Model for Enterprise Interoperabillity [J].
Guedria, Wided ;
Chen, David ;
Naudet, Yannick .
ON THE MOVE TO MEANINGFUL INTERNET SYSTEMS: OTM 2009 WORKSHOPS, 2009, 5872 :216-+
[23]   A Maturity Assessment Framework for Applying BIM in Consultant Companies [J].
Abbasianjahromi, Hamidreza ;
Ahangar, Mehdi ;
Ghahremani, Farhad .
IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2019, 43 (Suppl 1) :637-649
[24]   A Maturity Assessment Framework for Applying BIM in Consultant Companies [J].
Hamidreza Abbasianjahromi ;
Mehdi Ahangar ;
Farhad Ghahremani .
Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2019, 43 :637-649
[25]   Maturity Assessment of Cyber Security in The Workforce Management Domain: A Case Study in Bank Indonesia [J].
Putra, Adyan Pamungkas Ganefi ;
Humani, Figur ;
Zakiy, Faishal Wafiq ;
Shihab, Muhammad Rifki ;
Ranti, Benny .
2020 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY SYSTEMS AND INNOVATION (ICITSI), 2020, :89-94
[26]   Development of an Assessment and Management Framework for Sustainable Construction Projects in Jordan by Incorporating the Sustainable Development Goals [J].
Alawneh, Rami ;
Jannoud, Ismael ;
Rabayah, Hesham ;
Imam, Rana ;
Almasaeid, Hatem .
INFRASTRUCTURES, 2024, 9 (07)
[27]   XMART VILLAGE MATURITY ASSESSMENT MODEL [J].
Hardilla, Dini ;
Muladi, Nadinastiti .
SOCIOINT16: 3RD INTERNATIONAL CONFERENCE ON SOCIAL SCIENCES AND HUMANITIES, 2016, :29-36
[28]   A Maturity Model Assessing Interoperability Potential [J].
Guedria, Wided ;
Naudet, Yannick ;
Chen, David .
ENTERPRISE, BUSINESS-PROCESS AND INFORMATION SYSTEMS MODELING, 2011, 81 :276-+
[29]   A MATURITY MODEL FOR HIGHER EDUCATION INSTITUTIONS [J].
Duarte, Duarte ;
Martins, Paula Ventura .
JOURNAL OF SPATIAL AND ORGANIZATIONAL DYNAMICS, 2013, 1 (01) :25-45
[30]   SOA maturity model a frame of reference [J].
Pulparambil, Supriya ;
Baghdadi, Youcef .
2016 IEEE STUDENTS' CONFERENCE ON ELECTRICAL, ELECTRONICS AND COMPUTER SCIENCE (SCEECS), 2016,