Post-tensioned splice system for precast, prestressed concrete piles: Part 3, capacity verification from laboratory and full-scale testing

被引:0
|
作者
Wu, Zhongxin [1 ]
Johnson, Kevin [2 ]
Mullins, Gray [3 ]
Sen, Rajan [4 ,5 ,6 ]
机构
[1] Shenyang City Univ, Dept Civil Engn, Shenyang, Liaoning, Peoples R China
[2] Earth Tech, Land OLakes, FL USA
[3] USF, Dept Civil & Environm Engi, Tampa, FL USA
[4] USF, Civil Engn, Tampa, FL USA
[5] Indian Inst Technol Kharagpur, Coll Engn, Kharagpur, W Bengal, India
[6] Indian Inst Technol Kharagpur, Sch Architecture & Community Design, Kharagpur, W Bengal, India
来源
PCI JOURNAL | 2018年
关键词
Cast-in connection details; connection; coring; doweling; load; pile extension; splice connection; splicing;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Splicing precast, prestressed concrete piles has historically been difficult because the attachment detail requires either preplanned considerations and cast-in connection details or onsite coring and doweling when unplanned pile extensions arc needed. When the piles are driven after splicing, the splice connection is prone to tensile failures due to the inability to transfer tensile driving stresses through the connection and into the other pile segment. Focusing on preplanned splices, the Florida Department of Transportation limits tension stresses during driving to 250 and 500 psi (1700 and 3400 kPa) for epoxy dowel splices and mechanical splices, respectively. This can limit the ability to efficiently drive the pile to the point that it may even he impossible. In response to the need for a more robust splicing methodology, an alternative pile-splicing approach incorporating post-tensioning was developed. The concept eliminates the limitations on tension stresses during driving. This is the third of three papers that details the development and implementation of the new approach into a prototype system. This involved laboratory and full-scale studies and subsequent ultimate load verification tests. The findings show that the concept is scalable and implementable in commercial facilities with minor adjustments.
引用
收藏
页码:19 / 35
页数:17
相关论文
共 21 条
  • [11] Time-dependent behavior of full-scale precast post-tensioned (PCPT) girders: Experimental and finite element analysis
    Joyklad, Panuwat
    Ali, Nazam
    Chaiyasarn, Krisada
    Suparp, Suniti
    Hussain, Qudeer
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2022, 17
  • [12] Experimental investigation of full-scale post-tensioned composite AASHTO beams prestressed with carbon-fiber-reinforced polymer cables
    Manaa, Mahmoud R.
    Belarbi, Abdeldjelil
    Gencturk, Bora
    Dawood, Mina
    PCI JOURNAL, 2024, 69 (01): : 40 - 57
  • [13] Full-scale load testing for evaluating crack performance in precast prestressed concrete communication towers with annular sections
    Pu, Wuchuan
    Zhang, Qishuo
    Jia, Quan
    Wei, Wenfei
    Li, Bo
    RESULTS IN ENGINEERING, 2024, 24
  • [14] Full-Scale Testing of a Precast Concrete Supertile Roofing System for Hurricane Damage Mitigation
    Mintz, Brandon
    Mirmiran, Amir
    Suksawang, Nakin
    Chowdhury, Arindam Gan
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2016, 22 (03)
  • [15] Full-scale testing of a precast concrete supertile roofing system for hurricane damage mitigation
    Mintz, Brandon
    Mirmiran, Amir
    Suksawang, Nakin
    Gan Chowdhury, Arindam
    Journal of Architectural Engineering, 2016, 22 (03):
  • [16] Full-scale testing of prefabricated full-depth precast concrete bridge deck panel system
    Issa, Mohsen A.
    Anderson, Ralph
    Domagalski, Thomas
    Asfour, Shaker
    Islam, M. S.
    ACI STRUCTURAL JOURNAL, 2007, 104 (03) : 324 - 332
  • [17] A review of moisture buffering capacity: From laboratory testing to full-scale measurement
    Cascione, Valeria
    Maskell, Daniel
    Shea, Andy
    Walker, Pete
    CONSTRUCTION AND BUILDING MATERIALS, 2019, 200 : 333 - 343
  • [18] Experimental study of the load-deformation behaviour of the precast post-tensioned continuous girder for straddle monorail: Full-scale load test under service and ultimate loading conditions
    Sirisonthi, Athasit
    Suparp, Suniti
    Joyklad, Panuwat
    Hussain, Qudeer
    Julphunthong, Phongthorn
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2021, 15
  • [19] A review of electrically conductive concrete heated pavement system technology: From the laboratory to the full-scale implementation
    Rahman, Md Lutfor
    Malakooti, Amir
    Ceylan, Halil
    Kim, Sunghwan
    Taylor, Peter C.
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 329
  • [20] Analytical assessment of an irregular RC frame for full-scale 3D pseudo-dynamic testing Part I: Analytical model verification
    Jeong, SH
    Elnashai, AS
    JOURNAL OF EARTHQUAKE ENGINEERING, 2005, 9 (01) : 95 - 128