Post-tensioned splice system for precast, prestressed concrete piles: Part 3, capacity verification from laboratory and full-scale testing

被引:0
|
作者
Wu, Zhongxin [1 ]
Johnson, Kevin [2 ]
Mullins, Gray [3 ]
Sen, Rajan [4 ,5 ,6 ]
机构
[1] Shenyang City Univ, Dept Civil Engn, Shenyang, Liaoning, Peoples R China
[2] Earth Tech, Land OLakes, FL USA
[3] USF, Dept Civil & Environm Engi, Tampa, FL USA
[4] USF, Civil Engn, Tampa, FL USA
[5] Indian Inst Technol Kharagpur, Coll Engn, Kharagpur, W Bengal, India
[6] Indian Inst Technol Kharagpur, Sch Architecture & Community Design, Kharagpur, W Bengal, India
来源
PCI JOURNAL | 2018年
关键词
Cast-in connection details; connection; coring; doweling; load; pile extension; splice connection; splicing;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Splicing precast, prestressed concrete piles has historically been difficult because the attachment detail requires either preplanned considerations and cast-in connection details or onsite coring and doweling when unplanned pile extensions arc needed. When the piles are driven after splicing, the splice connection is prone to tensile failures due to the inability to transfer tensile driving stresses through the connection and into the other pile segment. Focusing on preplanned splices, the Florida Department of Transportation limits tension stresses during driving to 250 and 500 psi (1700 and 3400 kPa) for epoxy dowel splices and mechanical splices, respectively. This can limit the ability to efficiently drive the pile to the point that it may even he impossible. In response to the need for a more robust splicing methodology, an alternative pile-splicing approach incorporating post-tensioning was developed. The concept eliminates the limitations on tension stresses during driving. This is the third of three papers that details the development and implementation of the new approach into a prototype system. This involved laboratory and full-scale studies and subsequent ultimate load verification tests. The findings show that the concept is scalable and implementable in commercial facilities with minor adjustments.
引用
收藏
页码:19 / 35
页数:17
相关论文
共 21 条
  • [1] Post-tensioned splice system for precast, prestressed concrete piles: Part 1, conceptual design
    Mullins, Gray
    Johnson, Kevin
    Sen, Rajan
    PCI JOURNAL, 2018, : 26 - 39
  • [2] Full-scale experimental study on post-tensioned prestressed precast frame structures
    Guo H.
    Shi P.
    Qi H.
    Wu B.
    Pan P.
    Li L.
    Liu K.
    Wang D.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2021, 42 (07): : 119 - 132
  • [3] Full-scale experimental research on the bending fatigue performance of post-tensioned prestressed concrete pipe piles
    Liu, Rui
    Su, Jing-Bo
    Wu, Feng
    Lv, Yaru
    Guo, Yunchuan
    Bao, Jinhu
    Ge, Zhihong
    OCEAN ENGINEERING, 2022, 260
  • [4] Shear behavior of full-scale post-tensioned prestressed concrete bridge girders
    Oh, BH
    Kim, KS
    ACI STRUCTURAL JOURNAL, 2004, 101 (02) : 176 - 182
  • [5] Post tensioned splice system for precast, prestressed concrete piles: Part 2, field implementation and driving spliced pile
    Mullins, Gray
    Wu, Zhongxin
    Johnson, Kevin
    Sen, Rajan
    PCI JOURNAL, 2018, : 28 - 40
  • [6] Instrumentation and Full-Scale Test of a Post-Tensioned Concrete Bridge
    Bagge, Niklas
    Nilimaa, Jonny
    Blanksvard, Thomas
    Elfgren, Lennart
    NORDIC CONCRETE RESEARCH, 2014, 51 (03): : 63 - 83
  • [7] Full-scale investigation of post-tensioned prestressed concrete bridge girders subjected to frost heaving in cold regions
    Sun, Baolin
    Yang, Yongqing
    Li, Xiaobin
    Yan, Meng
    Xie, Mingzhi
    Bao, Yi
    Engineering Structures, 2022, 250
  • [8] Full-scale investigation of post-tensioned prestressed concrete bridge girders subjected to frost heaving in cold regions
    Sun, Baolin
    Yang, Yongqing
    Li, Xiaobin
    Yan, Meng
    Xie, Mingzhi
    Bao, Yi
    ENGINEERING STRUCTURES, 2022, 250
  • [9] Experimental study on a five-story full-scale post-tensioned prestressed precast frame with failure of top corner column
    Shi Y.
    Li L.
    Guo H.
    Li Z.
    Shi P.
    Zhao B.
    Zhou J.
    Liu H.
    Guo Z.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2023, 44 (05): : 101 - 113
  • [10] EXPERIMENTAL AND ANALYTICAL STUDIES OF A FULL-SCALE POST-TENSIONED PRECAST RCS FRAME UNDER EARTHQUAKES
    Chou, Chungche
    Chen, Junhen
    ADVANCE IN STRUCTURAL ENGINEERING, 2010, : 28 - 38