Commissioning of the spallation neutron source front end systems

被引:6
|
作者
Aleksandrov, A [1 ]
机构
[1] Oak Ridge Natl Lab, Spallat Neutron Source, Oak Ridge, TN 37830 USA
关键词
D O I
10.1109/PAC.2003.1288842
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
The Front-End (FE) for the Spallation Neutron Source (SNS) accelerator system is a 2.5-MeV linac injector consisting of the following major subsystems, the rf-driven H- ion source, the electrostatic Low Energy Beam Transport line, a 402.5 MHz RFQ, the Medium Energy Beam Transport line, a beam chopper system and a suite of diagnostic devices. After construction and initial commissioning at LBNL the Front End was shipped to Oak Ridge in the summer of 2002, installed at the SNS site and re-commissioned. This paper provides an overview of the major design features and the experimental results obtained during the final commissioning of the Front End Systems. Performance of the various subsystems will be described, and the final beam output performance will be summarized.
引用
收藏
页码:65 / 69
页数:5
相关论文
共 50 条
  • [1] The Front-End Systems for the Spallation Neutron Source.
    Keller, R
    APPLICATION OF ACCELERATORS IN RESEARCH AND INDUSTRY, 2001, 576 : 362 - 365
  • [2] Commissioning of the spallation neutron source accelerator systems
    Plum, M. A.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2471 - 2475
  • [3] Spallation Neutron Source Superconducting linac commissioning algorithms
    Henderson, S
    Campisi, I
    Galambos, J
    Jeon, D
    Zhang, Y
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 237 - 239
  • [4] Commissioning of cryogenic system for China Spallation Neutron Source
    Ye Bin
    He Chongchao
    Li Na
    Ding Meiying
    Wang Yaqiong
    Zhang Yu
    He Kun
    ADVANCES IN CRYOGENIC ENGINEERING, 2017, 278
  • [5] Commissioning of the superconducting Linac at the spallation neutron source (SNS)
    Kim, Sang-ho
    Campisi, Isidoro E.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2007, 17 (02) : 1299 - 1304
  • [6] Software tools for commissioning of the Spallation Neutron Source Linac
    Galambos, J.
    Aleksandrov, A.
    Allen, C. K.
    Henderson, S.
    Shishlo, A.
    Pelaia, T.
    Zhang, Y.
    Chu, C. P.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2556 - +
  • [7] Commissioning of the 1 MW spallation neutron source SINQ
    Bauer, GS
    Fischer, WE
    Rohrer, U
    Schryber, U
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3785 - 3787
  • [8] Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector
    Welton, R. F.
    Han, B. X.
    Stockli, M. P.
    Murray, S. N.
    Pennisi, T. R.
    Stinson, C.
    Barnett, W.
    Aleksandrov, A.
    Piller, M.
    Saethre, R.
    Kang, Y.
    Zhukov, A.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2020, 91 (01):
  • [9] The commissioning plan for the spallation neutron source ring and transport lines
    Henderson, S
    Assadi, S
    Cousineau, S
    Dodson, G
    Danilov, V
    Galambos, J
    Holmes, J
    Reece, K
    Shea, T
    Raparia, D
    Blaskiewicz, M
    Lee, YY
    Papaphilippou, Y
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 1569 - 1571
  • [10] Spallation neutron source target station design, development, and commissioning
    Haines, J. R.
    McManamy, T. J.
    Gabriel, T. A.
    Battle, R. E.
    Chipley, K. K.
    Crabtree, J. A.
    Jacobs, L. L.
    Lousteau, D. C.
    Rennich, M. J.
    Riemer, B. W.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2014, 764 : 94 - 115