On the optimal management of project risk

被引:50
作者
Tavares, LV [1 ]
Ferreira, JAA [1 ]
Coelho, JS [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Inst Super Tecn, P-1000 Lisbon, Portugal
关键词
project management; scheduling; risk analysis; finance;
D O I
10.1016/S0377-2217(97)00344-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The uncertainty of project networks has been mainly considered as the randomness of duration of the activities. However, another major problem for project managers is the uncertainty due to the randomness of the amount of resources required by each activity which can be expressed by the randomness of its cost. Such randomness can seriously affect the discounted cost of the project and it may be strongly correlated with the duration of the activity. In this paper, a model considering the randomness of both the cost and the duration of each activity is introduced and the problem of project scheduling is studied in terms of the project's discounted cost and of the risk of not meeting its completion time. The adoption of the earliest (latest) starting time for each activity decreases (increases) the risk of delays but increases (decreases) the discounted cost of the project. Therefore, an optimal compromise has to be achieved. This problem of optimization is studied in terms of the probability of the duration and of the discounted cost of the project falling outside the acceptable domain (Risk function) using the concept of float factor as major decision variable. This last concept is proposed to help the manager to synthetize the large number of the decision variables representing each schedule for the studied project. Numerical results are also presented for a specific project network. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:451 / 469
页数:19
相关论文
共 50 条
  • [41] Research on the risk management of Harbin metro project
    Zhang Dequn
    Wang Huimo
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 921 - 923
  • [42] A Study on Risk Management in Reservoir Operation Project
    Gao Jun
    Liu Xiantao
    Li Wenjing
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 98 - 101
  • [43] Effects of Risk Management Practice on the Success of IT Project
    Pimchangthong, Daranee
    Boonjing, Veera
    7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 : 579 - 586
  • [44] Application Research of AHP in Project Risk Management
    Yang Qiang
    Zhang Yu
    CURRENT TRENDS IN THE DEVELOPMENT OF INDUSTRY, PTS 1 AND 2, 2013, 785-786 : 1480 - 1483
  • [45] RISK MANAGEMENT IN THE AGILE APPROACH AND PROJECT SUCCESS
    Fernandes, Pedro Jose Martins Alvarez
    Rabechini Jr, Roque
    REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2023, 23 (01): : 138 - 162
  • [46] A Hypertextual Database for Risk Management in International Project
    Guo, Qi
    Fang, Qing
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT, PTS 1-3, 2012, 209-211 : 1271 - 1276
  • [47] FROM COMPLEXITY ANALYSIS TO PROJECT RISK MANAGEMENT
    Canas Mejia, Gustavo
    REVISTA CIENCIAS ESTRATEGICAS, 2015, 23 (34): : 249 - 264
  • [48] A risk management approach for collaborative NPD project
    Deniaud, Ioana Filipas
    Marmier, Francois
    Gourc, Didier
    Bougaret, Sophie
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [49] Risk factors in project management life cycle
    Karaulova, T.
    Kramarenko, S.
    Shevtshenko, E.
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE OF DAAAM BALTIC INDUSTRIAL ENGINEERING, PTS 1 AND 2, 2008, : 327 - 332
  • [50] mPRIME -: Multiple project Risk Management tool
    Gomes de Gusmao, Cristine martins
    de Moura, Hermano Perrelli
    Information Technology Management from a Business Perspective, 2007, : 100 - 101