On the optimal management of project risk

被引:51
|
作者
Tavares, LV [1 ]
Ferreira, JAA [1 ]
Coelho, JS [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Inst Super Tecn, P-1000 Lisbon, Portugal
关键词
project management; scheduling; risk analysis; finance;
D O I
10.1016/S0377-2217(97)00344-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The uncertainty of project networks has been mainly considered as the randomness of duration of the activities. However, another major problem for project managers is the uncertainty due to the randomness of the amount of resources required by each activity which can be expressed by the randomness of its cost. Such randomness can seriously affect the discounted cost of the project and it may be strongly correlated with the duration of the activity. In this paper, a model considering the randomness of both the cost and the duration of each activity is introduced and the problem of project scheduling is studied in terms of the project's discounted cost and of the risk of not meeting its completion time. The adoption of the earliest (latest) starting time for each activity decreases (increases) the risk of delays but increases (decreases) the discounted cost of the project. Therefore, an optimal compromise has to be achieved. This problem of optimization is studied in terms of the probability of the duration and of the discounted cost of the project falling outside the acceptable domain (Risk function) using the concept of float factor as major decision variable. This last concept is proposed to help the manager to synthetize the large number of the decision variables representing each schedule for the studied project. Numerical results are also presented for a specific project network. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:451 / 469
页数:19
相关论文
共 50 条
  • [22] A risk management model for project execution
    ALHawari, Sarner
    Thabtah, Fadi
    Karadsheh, Louay
    Hadi, Wa'el Musa
    INFORMATION MANAGEMENT IN THE MODERN ORGANIZATIONS: TRENDS & SOLUTIONS, VOLS 1 AND 2, 2008, : 887 - 893
  • [23] Risk management process in construction project
    Liu Renhui
    Tai Shuangliang
    Zhao Qingjie
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 843 - 846
  • [24] Risk Management and the Life Cycle of the Project
    Obrova, Vladena
    Smolikova, Lenka
    CREATING GLOBAL COMPETITIVE ECONOMIES: 2020 VISION PLANNING & IMPLEMENTATION, VOLS 1-3, 2013, : 1370 - 1377
  • [25] Probabilistic Risk Management in Project Portfolios
    Danielson, Mats
    Ekenberg, Love
    PROCEEDINGS OF THE TWELVETH INTERNATIONAL SYMPOSIUM ON IMPRECISE PROBABILITY: THEORIES AND APPLICATIONS, 2021, 147 : 361 - 364
  • [26] WikiRiskMan: A Framework for Project Risk Management
    Camara, Ricardo
    Soares, Rogerio
    Tessi, Mauricio
    Chaves, Marcirio Silveira
    AMCIS 2015 PROCEEDINGS, 2015,
  • [27] Project Risk Management using DSMs
    Minogue, Paschal
    REDUCING RISK IN INNOVATION, 2013, : 29 - 36
  • [28] Integrated methodology for project risk management
    del Caño, A
    de la Cruz, MP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (06) : 473 - 485
  • [29] A portfolio management for managing risk in a project
    Amornsawadwatana, Sataporn
    Ahmed, Ammar
    Kayis, Berman
    TOOLS AND METHODS OF COMPETITIVE ENGINEERING VOLS 1 AND 2, 2004, : 475 - 483
  • [30] Application of Risk Management in the Energy Engineering Project Management
    Guo Yuanli
    STATISTIC APPLICATION IN MODERN SOCIETY, 2015, : 307 - 312