On the optimal management of project risk

被引:51
|
作者
Tavares, LV [1 ]
Ferreira, JAA [1 ]
Coelho, JS [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Inst Super Tecn, P-1000 Lisbon, Portugal
关键词
project management; scheduling; risk analysis; finance;
D O I
10.1016/S0377-2217(97)00344-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The uncertainty of project networks has been mainly considered as the randomness of duration of the activities. However, another major problem for project managers is the uncertainty due to the randomness of the amount of resources required by each activity which can be expressed by the randomness of its cost. Such randomness can seriously affect the discounted cost of the project and it may be strongly correlated with the duration of the activity. In this paper, a model considering the randomness of both the cost and the duration of each activity is introduced and the problem of project scheduling is studied in terms of the project's discounted cost and of the risk of not meeting its completion time. The adoption of the earliest (latest) starting time for each activity decreases (increases) the risk of delays but increases (decreases) the discounted cost of the project. Therefore, an optimal compromise has to be achieved. This problem of optimization is studied in terms of the probability of the duration and of the discounted cost of the project falling outside the acceptable domain (Risk function) using the concept of float factor as major decision variable. This last concept is proposed to help the manager to synthetize the large number of the decision variables representing each schedule for the studied project. Numerical results are also presented for a specific project network. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:451 / 469
页数:19
相关论文
共 50 条
  • [1] PROJECT RISK MANAGEMENT
    Bran, Florina
    Hincu, Daniela
    Radulescu, Carmen Valentina
    METALURGIA INTERNATIONAL, 2009, 14 : 102 - 105
  • [2] Simulating the potential effect of risk management on project scheduling
    Suri, P.K.
    Soni, Rachna
    Information Technology Journal, 2007, 6 (01) : 8 - 13
  • [3] Adaptive project risk management
    Deleris, Lea A.
    Katircioglu, Kaan
    Kapoor, Shubir
    Lam, Richard
    Bagchi, Sugato
    PROCEEDINGS OF THE 2007 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, 2007, : 281 - +
  • [4] Enhancements in software project risk management
    Wieland, P
    Hogberg, F
    Stromseng, K
    RELIABLE SOFTWARE TECHNOLOGIES ADA-EUROPE 2000, 2000, 1845 : 161 - 172
  • [5] The Analysis of Project Risk Management Based on AHP
    Liu Hongyan
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 576 - 579
  • [6] Risk assessment in oilfield services project management
    Radisic, Mladen
    Radisic, Ognjen
    Radisic, Maja
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2021, 28 (01) : 80 - 100
  • [7] Project risk management as the part of the enterprise risk management
    Rybarova, Daniela
    FINANCIAL MANAGEMENT OF FIRMS AND FINANCIAL INSTITUTIONS: 9TH INTERNATIONAL SCIENTIFIC CONFERENCE PROCEEDINGS, PTS I-III, 2013, : 746 - 752
  • [8] Information acquisition and optimal project management
    Shin, Dongsoo
    INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2008, 26 (04) : 1032 - 1043
  • [9] Optimal Incentive Contracts in Project Management
    Dawande, Milind
    Janakiraman, Ganesh
    Qi, Anyan
    Wu, Qi
    PRODUCTION AND OPERATIONS MANAGEMENT, 2019, 28 (06) : 1431 - 1445
  • [10] Algebraic Solution of a Problem of Optimal Project Scheduling in Project Management
    N. K. Krivulin
    S. A. Gubanov
    Vestnik St. Petersburg University, Mathematics, 2021, 54 : 58 - 68