Modeling and solving the project selection and Scheduling

被引:50
作者
Tofighian, Ali Asghar [1 ]
Naderi, B. [1 ]
机构
[1] Kharazmi Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Project selection and scheduling; Mixed integer linear programming model; Multi-objective ant colony optimization; ANT COLONY OPTIMIZATION; PORTFOLIO SELECTION; INTERDEPENDENT PROJECTS; SYSTEM; ALGORITHM;
D O I
10.1016/j.cie.2015.01.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the integrated bi-objective problem of projects selection and scheduling to optimize both total expected benefit and resource usage variation. The benefit is time-dependent. Although this integrated problem has become a very active field of research, the available model and algorithms suffer from serious shortcomings. This paper analyzes the available methods and develops a novel mathematical model, in form of a mixed integer linear program, for the problem. Then, it proposes an ant colony optimization algorithm employing four features of ant generation, colonial, Pareto front updating, and pheromone updating mechanisms. To evaluate the proposed algorithm, it is compared with two available genetic algorithm anotscatter search. Using comprehensive numerical experiments and statistical tools, it is shown that the proposed ant colony optimization outperforms the two available algorithms. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:30 / 38
页数:9
相关论文
共 50 条
  • [31] Solving Logistics Scheduling Problems Using an Extended Many-Project Optimization Model
    Mihaly, Krisztian
    Forrai, Monika Kulcsarne
    Kulcsar, Gyula
    [J]. ADVANCES IN DIGITAL LOGISTICS, LOGISTICS AND SUSTAINABILITY, CECOL 2024, 2024, : 115 - 144
  • [32] A Hybrid Differential Evolution with Cuckoo Search for Solving Resource Constrained Project Scheduling Problems
    Sallam, Karam M.
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1344 - 1348
  • [33] Pharmaceutical R&D project portfolio selection and scheduling under uncertainty: A robust possibilistic optimization approach
    Hesarsorkh, Aghil Hamidi
    Ashayeri, Jalal
    Naeini, Ali Bonyadi
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 155
  • [34] Project selection and scheduling for phase-able projects with interdependencies among phases
    Shafahi, Ali
    Haghani, Ali
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 93 : 47 - 62
  • [35] An interactive multi-objective programming approach for project portfolio selection and scheduling
    Zorluoglu, Ozge Sahin
    Kabak, Ozgur
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [36] Modeling and solving the multi-period disruptions scheduling problem on urban networks
    Coco, Amadeu A.
    Duhamel, Christophe
    Santos, Andrea Cynthia
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) : 427 - 443
  • [37] Modeling and solving multi-phase allocation and scheduling of emergency relief supplies
    Liu Y.
    Zhang G.-F.
    Su Z.-P.
    Jiang J.-G.
    [J]. Kongzhi yu Juece/Control and Decision, 2019, 34 (09): : 2015 - 2022
  • [38] Solving multi-period project selection problems with fuzzy goal programming based on TOPSIS and a fuzzy preference relation
    Khalili-Damghani, Kaveh
    Sadi-Nezhad, Soheil
    Tavana, Madjid
    [J]. INFORMATION SCIENCES, 2013, 252 : 42 - 61
  • [39] Differential evolution for solving multi-mode resource-constrained project scheduling problems
    Damak, N.
    Jarboui, B.
    Siarry, P.
    Loukil, T.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2653 - 2659
  • [40] A Time Wave Neural Network Framework for Solving Time-Dependent Project Scheduling Problems
    Huang, Wei
    Gao, Liang
    [J]. IEEE TRANSACTIONS ON NEURAL NETWORKS AND LEARNING SYSTEMS, 2020, 31 (01) : 274 - 283