Modeling and solving the project selection and Scheduling

被引:50
作者
Tofighian, Ali Asghar [1 ]
Naderi, B. [1 ]
机构
[1] Kharazmi Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Project selection and scheduling; Mixed integer linear programming model; Multi-objective ant colony optimization; ANT COLONY OPTIMIZATION; PORTFOLIO SELECTION; INTERDEPENDENT PROJECTS; SYSTEM; ALGORITHM;
D O I
10.1016/j.cie.2015.01.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the integrated bi-objective problem of projects selection and scheduling to optimize both total expected benefit and resource usage variation. The benefit is time-dependent. Although this integrated problem has become a very active field of research, the available model and algorithms suffer from serious shortcomings. This paper analyzes the available methods and develops a novel mathematical model, in form of a mixed integer linear program, for the problem. Then, it proposes an ant colony optimization algorithm employing four features of ant generation, colonial, Pareto front updating, and pheromone updating mechanisms. To evaluate the proposed algorithm, it is compared with two available genetic algorithm anotscatter search. Using comprehensive numerical experiments and statistical tools, it is shown that the proposed ant colony optimization outperforms the two available algorithms. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:30 / 38
页数:9
相关论文
共 50 条
  • [21] Modeling and Solving Scheduling in Overloaded Situations with Weighted Partial MaxSAT
    Liao, Xiaojuan
    Zhang, Hui
    Koshimura, Miyuki
    Huang, Rong
    Yu, Wenxin
    Li, Fagen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [22] Project selection and scheduling with uncertain net income and investment cost
    Huang, Xiaoxia
    Zhao, Tianyi
    APPLIED MATHEMATICS AND COMPUTATION, 2014, 247 : 61 - 71
  • [23] Project selection and scheduling with multiplicative enhancement effects and delay risk: An application in intelligent manufacturing technologies
    Liu, Xiaohang
    Liang, Jingran
    Zhang, Zhi-hai
    Yang, Shun
    Peukert, Sina
    Lanza, Gisela
    IISE TRANSACTIONS, 2024,
  • [24] MULTI MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEMS WITH SOLVING TABOO SEARCH
    Atli, Omer
    Kahraman, Cengiz
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 448 - 453
  • [25] A Novel Multi-Objective Project Portfolio Selection and Scheduling Problem
    Harrison, Kyle Robert
    Elsayed, Saber M.
    Weir, Terence
    Garanovich, Ivan L.
    Boswell, Sharon G.
    Sarker, Ruhul A.
    2022 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2022, : 480 - 487
  • [26] A DSS Solution for Integrated Automated Bidding, Subcontractor Selection and Project Scheduling
    Pakgohar, Alireza
    Childe, Stephen J.
    Zhang, David Z.
    DECISION SUPPORT SYSTEMS II - RECENT DEVELOPMENTS APPLIED TO DSS NETWORK ENVIRONMENTS, 2013, 164 : 72 - 85
  • [27] Application of the Metaheuristic ANGEL in Solving Multiple Projects Resource-Constrained Project Scheduling Problem with Total Tardy Cost
    Chen, Shih-Chieh
    2014 7TH INTERNATIONAL CONFERENCE ON UBI-MEDIA COMPUTING AND WORKSHOPS (UMEDIA), 2014, : 199 - 204
  • [28] Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization
    Qi, Jianjun
    Guo, Bo
    Lei, Hongtao
    Zhang, Tao
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2014, 25 (01) : 69 - 76
  • [29] An evolutionary implicit enumeration procedure for solving the resource-constrained project scheduling problem
    Zamani, Reza
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2017, 24 (06) : 1525 - 1547
  • [30] Solving Resource-Constrained Project Scheduling Problem by A Genetic Local Search Approach
    Dridi, Olfa
    Krichen, Saoussen
    Guitouni, Adel
    2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,