Modeling and solving the project selection and Scheduling

被引:49
|
作者
Tofighian, Ali Asghar [1 ]
Naderi, B. [1 ]
机构
[1] Kharazmi Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Project selection and scheduling; Mixed integer linear programming model; Multi-objective ant colony optimization; ANT COLONY OPTIMIZATION; PORTFOLIO SELECTION; INTERDEPENDENT PROJECTS; SYSTEM; ALGORITHM;
D O I
10.1016/j.cie.2015.01.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the integrated bi-objective problem of projects selection and scheduling to optimize both total expected benefit and resource usage variation. The benefit is time-dependent. Although this integrated problem has become a very active field of research, the available model and algorithms suffer from serious shortcomings. This paper analyzes the available methods and develops a novel mathematical model, in form of a mixed integer linear program, for the problem. Then, it proposes an ant colony optimization algorithm employing four features of ant generation, colonial, Pareto front updating, and pheromone updating mechanisms. To evaluate the proposed algorithm, it is compared with two available genetic algorithm anotscatter search. Using comprehensive numerical experiments and statistical tools, it is shown that the proposed ant colony optimization outperforms the two available algorithms. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:30 / 38
页数:9
相关论文
共 50 条
  • [1] Modeling and Solving Project Scheduling with Calendars
    Kreter, Stefan
    Schutt, Andreas
    Stuckey, Peter J.
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2015, 2015, 9255 : 262 - 278
  • [2] Modeling and solving project portfolio and contractor selection problem based on project scheduling under uncertainty
    Namazian, Ali
    Yakhchali, Siamak Haji
    PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 35 - 42
  • [3] Solving Transport Infrastructure Investment Project Selection and Scheduling Using Genetic Algorithms
    Jecmen, Karel
    Mockova, Denisa
    Teichmann, Dusan
    MATHEMATICS, 2024, 12 (19)
  • [4] Solving a novel multi-divisional project portfolio selection and scheduling problem
    Harrison, Kyle Robert
    Elsayed, Saber M.
    Weir, Terence
    Garanovich, Ivan L.
    Boswell, Sharon G.
    Sarker, Ruhul A.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2022, 112
  • [5] Modeling and solving the resource-constrained project scheduling problem with activities overlapping
    Yu, Jing
    Xu, Zhe
    Li, Hong-Bo
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (05): : 1236 - 1245
  • [6] Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm
    Amirian, Homa
    Sahraeian, Rashed
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 141 - 149
  • [7] An intelligent approach for solving project scheduling problems
    Shue, LY
    Zamani, R
    CRITICAL TECHNOLOGY: PROCEEDINGS OF THE THIRD WORLD CONGRESS ON EXPERT SYSTEMS, VOLS I AND II, 1996, : 359 - 366
  • [8] Energy project portfolio selection and scheduling
    Tselios, Dimitrios
    Papageorgiou, Grigorios
    Alamanis, Nikolaos
    Ipsilandis, Pandelis
    ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2024, 15 (04): : 1471 - 1480
  • [9] A Novel Project Selection Scheduling Model
    Amirian, H.
    Sahraeian, Rashed
    CLOSING THE GAP BETWEEN PRACTICE AND RESEARCH IN INDUSTRIAL ENGINEERING, 2018, : 85 - 94
  • [10] A New Priority Rule for Solving Project Scheduling Problems
    Patience I. Adamu
    Hilary I. Okagbue
    Pelumi E. Oguntunde
    Wireless Personal Communications, 2019, 106 : 681 - 699