Object-oriented scheduling for repetitive projects with soft logics

被引:30
作者
Fan, SL [1 ]
Tserng, HP [1 ]
机构
[1] Natl Taiwan Univ, Div Construct Engn & Management, Dept Civil Engn, Taipei, Taiwan
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:1(35)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require a large number of activities to represent a repetitive project and presume that there is only one logical sequence. This makes schedules time consuming to develop as well as maintain. Further, the logic chosen by the planner might be far from the shortest possible duration. This paper, utilizing the soft logic sequencing principles developed by Fan et al., develops a system which provides an easy input module in addition to scheduling and work-continuity-maintenance modules. The system eases the network generation and update processes, which in turn provides the shortest possible duration logics and the start and finish dates required to maintain work continuity.
引用
收藏
页码:35 / 48
页数:14
相关论文
共 24 条
[1]   PROBABILISTIC SIMULATION STUDIES FOR REPETITIVE CONSTRUCTION PROCESSES [J].
ABOURIZK, SM ;
HALPIN, DW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :575-594
[2]  
CARR RI, 1974, J CONSTRUCT DIV-ASCE, V100, P403
[3]   Optimizing resource utilization for repetitive construction projects [J].
El-Rayes, K ;
Moselhi, O .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01) :18-27
[4]  
ELSERSY AHE, 1993, THESIS U CALIFORNIA
[5]   Development of an object-oriented scheduling model for construction projects [J].
Fan, SL ;
Tserng, HP ;
Wang, MT .
AUTOMATION IN CONSTRUCTION, 2003, 12 (03) :283-302
[6]   Linear scheduling model: Development of controlling activity path [J].
Harmelink, DJ ;
Rowings, JE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (04) :263-268
[7]   Cost optimization in projects with repetitive nonserial activities [J].
Hegazy, T ;
Wassef, N .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (03) :183-191
[8]  
JOHNSTON DW, 1981, J CONSTRUCT DIV-ASCE, V107, P247
[9]   Optimal schedule planning for multiple repetitive construction process [J].
Kang, LS ;
Park, IC ;
Lee, BH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05) :382-390
[10]   SIREN - A REPETITIVE CONSTRUCTION SIMULATION-MODEL [J].
KAVANAGH, DP .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (03) :308-323