Shear-lag behavior of prestressed concrete box-girder bridges during balanced cantilever construction

被引:6
作者
Zhong, Xingu [1 ]
Zhang, Tianyu [1 ]
Shu, Xiaojuan [1 ]
Xu, Hongliang [2 ]
机构
[1] Hunan Univ Sci & Technol, Sch Civil Engn, Hunan Prov Key Lab Struct Engn Wind Resistant & V, Xiangtan 411201, Peoples R China
[2] China CEC Engn Corp, Changsha, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
box-girder bridges; balanced cantilever construction; shear-lag effect; the cumulative effect; prestress;
D O I
10.12989/acc.2017.5.5.469
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Balanced cantilever construction is extensively used in the construction of prestressed concrete (PSC) box-girder bridges. Shear-lag effect is usually considered in finished bridges, while the cumulative shear-lag effect in bridges during balanced cantilever construction is considered only rarely. In this paper, based on the balanced cantilever construction sequences of large-span PSC box-girder bridges, the difference method is employed to analyze the cumulative shear-lag effect of box girders with varying depth under the concrete segments' own weight. During cantilever construction, no negative shear-lag effect is generated, and the cumulative shear-lag effect under the balanced construction procedure is greater than the instantaneous shear-lag effect in which the full dead weight is applied to the entire cantilever. Three cross-sections of Jianjiang Bridge were chosen for the experimental observation of shear-lag effect, and the experimental results are in keeping with the theoretical results of cumulative shear-lag effect. The research indicates that only calculating the instantaneous shear-lag effect is not sufficiently safe for practical engineering purposes.
引用
收藏
页码:469 / 479
页数:11
相关论文
共 34 条
  • [1] The Finite Element Analysis on Shear-lag Effect of the Steel Box-girder
    Li, Yisheng
    Wang, Junping
    Liu, Wei
    Shen, Jianming
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 815 - 819
  • [2] Long-term behavior of segmentally-erected prestressed concrete box-girder bridges
    Hedjazi, S
    Rahai, A
    Sennah, K
    STRUCTURAL ENGINEERING AND MECHANICS, 2005, 20 (06) : 673 - 693
  • [3] Modeling of Temperature Time-Lag Effect for Concrete Box-Girder Bridges
    Yang, Kang
    Ding, Youliang
    Sun, Peng
    Zhao, Hanwei
    Geng, Fangfang
    APPLIED SCIENCES-BASEL, 2019, 9 (16):
  • [4] Heath monitoring system for long span prestressed concrete box-girder bridges
    Department of Civil Engineering, Tsinghua University, Beijing 100084, China
    不详
    Qinghua Daxue Xuebao, 2006, 12 (1957-1960):
  • [5] The shear-lag effect of composite box girder bridges with corrugated steel webs and trusses
    Chen, Yiyan
    Dong, Jucan
    Xu, Tianhua
    Xiao, Yufeng
    Jiang, Ruijuan
    Nie, Xinmin
    ENGINEERING STRUCTURES, 2019, 181 : 617 - 628
  • [6] ANALYSIS OF THE SHEAR LAG EFFECT OF CANTILEVER BOX GIRDER
    Zhou, Y.
    ENGINEERING REVIEW, 2014, 34 (03) : 197 - 207
  • [7] Parametric Analysis on Shear Lag Effects of Box-Girder Beam
    Ma, Shufen
    Zhang, Xiedong
    ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 152 - 155
  • [8] INFLUENCE OF FLANGE WIDTH ON THE SHEAR-LAG EFFECT FOR PC SKEWED BOX-SECTION GIRDER BRIDGES
    Bu, Jian-Qing
    Yang, Jin
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 233 - 238
  • [9] DYNAMIC ANALYSIS OF PRESTRESSED CONCRETE BOX-GIRDER BRIDGES BY USING THE BEAM SEGMENT FINITE ELEMENT METHOD
    Wang, Z-C.
    Ren, W-X.
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2011, 11 (02) : 379 - 399
  • [10] Bridge Deck Replacement of Posttensioned Concrete Box-Girder Bridges
    Zhang, Youyou
    Chai, Y. H.
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (12)