共 50 条
[22]
Multi-Objective Assembly Line Balancing Problem with Setup Times Using Fuzzy Goal Programming and Genetic Algorithm
[J].
SYMMETRY-BASEL,
2021, 13 (02)
:1-28
[23]
Demonstrating the importance of using total time balance instead of route balance on a multi-objective vehicle routing problem with time windows
[J].
The International Journal of Advanced Manufacturing Technology,
2018, 98
:1287-1306
[26]
An Improved Genetic Algorithm for Vehicle Routing Problem with Hard Time Windows
[J].
INTERNATIONAL CONFERENCE ON ELECTRICAL, COMPUTER AND ENERGY TECHNOLOGIES (ICECET 2021),
2021,
:1907-1912
[27]
Genetic Algorithm for the Vehicle Routing Problem with Time Windows and Fuzzy Demand
[J].
2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8,
2008,
:4125-4129
[28]
Improved genetic algorithm for vehicle routing problem with hard time windows
[J].
Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics,
2014, 36 (04)
:708-713