共 50 条
- [22] Multi-Objective Assembly Line Balancing Problem with Setup Times Using Fuzzy Goal Programming and Genetic Algorithm [J]. SYMMETRY-BASEL, 2021, 13 (02): : 1 - 28
- [23] Demonstrating the importance of using total time balance instead of route balance on a multi-objective vehicle routing problem with time windows [J]. The International Journal of Advanced Manufacturing Technology, 2018, 98 : 1287 - 1306
- [26] An Improved Genetic Algorithm for Vehicle Routing Problem with Hard Time Windows [J]. INTERNATIONAL CONFERENCE ON ELECTRICAL, COMPUTER AND ENERGY TECHNOLOGIES (ICECET 2021), 2021, : 1907 - 1912
- [27] Genetic Algorithm for the Vehicle Routing Problem with Time Windows and Fuzzy Demand [J]. 2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 4125 - 4129
- [28] Improved genetic algorithm for vehicle routing problem with hard time windows [J]. Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2014, 36 (04): : 708 - 713