Transmission Expansion Planning for the Optimization of Renewable Energy Integration in the Sulawesi Electricity System

被引:6
|
作者
Tumiran [1 ]
Putranto, Lesnanto Multa [1 ]
Irnawan, Roni [1 ]
Sarjiya [1 ]
Priyanto, Adi [2 ]
Isnandar, Suroso [2 ]
Savitri, Ira [2 ]
机构
[1] Univ Gadjah Mada, Dept Elect & Informat Engn, Graf St 2, Yogyakarta 55281, Indonesia
[2] PT PLN Persero, Trunojoyo St,Blok M-I 135, South Jakarta 12160, Dki Jakarta, Indonesia
关键词
transmission expansion planning; backbone voltage level; economic voltage; N-1; contingency; voltage stability; WIND;
D O I
10.3390/su131810477
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In order to meet the growth in demand and the renewable energy integration target, the Sulawesi Electricity System (SES) should be expanded. Currently, the SES is divided into two systems, namely South and North Sulawesi. These two systems have different characteristics, such as the system size, reliability and operational cost. North Sulawesi is smaller, weaker and more expensive than the South System. In order to improve the system reliability, generation and transmission expansion planning should be executed simultaneously to meet the economical investment cost and satisfy the reliability standard. For this purpose, the necessity of a backbone system with a higher voltage level than the existing 150 kV system should be considered, including the interconnection option between the two existing systems in Sulawesi. A methodology based on economic and technical criteria was developed to determine the backbone voltage level. Two voltage level options were considered, namely 275 and 500 kV. Several criteria were considered in order to determine the backbone voltage level, including the economic voltage, the line-loading limit, N-1 contingency, short circuiting, transient stability, voltage stability and small signal stability. The backbone voltage candidates should fulfil all of the criteria. The simulation was conducted in base- and high-demand scenarios, considering the fluctuation of future economic growth. The load flow and the dynamic analysis were simulated in a DIgSILENT Power Factory environment. The results showed that the 275 kV backbone, which was built in 2022, would violate three criteria: the economic voltage, N-1 contingency and voltage stability. On the other hand, the 500 kV backbone voltage level fulfills all of the criteria. The result of this research was considered in the electricity planning documents in Sulawesi. From a technical and economical perspective, the 500 kV backbone was chosen for the SES.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Curriculum Development: Transmission Expansion Planning for Systems with Renewable Energy Resources
    Heydt, Gerald T.
    Vittal, Vijay
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [22] Optimal planning of renewable energy systems for power loss reduction in transmission expansion planning
    Gbadamosi, Saheed Lekan
    Nwulu, Nnamdi, I
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (05) : 1209 - 1222
  • [23] Generation expansion planning for high-potential hydropower resources: The case of the sulawesi electricity system
    Tumiran
    Sarjiya
    Putranto L.M.
    Priyanto A.
    Savitri I.
    International Journal of Sustainable Energy Planning and Management, 2020, 28 : 37 - 52
  • [24] Multi‐year two-stage generation and transmission expansion planning: intermittent renewable energy sources integration for Brazilian interconnected power system
    Ranther Melo
    Carlos Torres
    Bruno Borba
    Bruno Dias
    Electrical Engineering, 2022, 104 : 2689 - 2701
  • [25] Generation expansion planning with a renewable energy target and interconnection option: A case study of the Sulawesi region, Indonesia
    Sarjiya
    Putranto, Lesnanto Multa
    Tumiran
    Budi, Rizki Firmansyah Setya
    Novitasari, Dwi
    Deendarlianto
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2023, 183
  • [26] Will the integration of renewable energy enable sustainable transition of Indian electricity system?
    Sharma, Tarun
    Balachandra, P.
    ENERGY STRATEGY REVIEWS, 2018, 21 : 137 - 148
  • [27] Transmission Grid Expansion Planning of a High Proportion Renewable Energy Power System Based on Flexibility and Economy
    Chen, Zhanpeng
    Hu, Yan
    Tai, Nengling
    Tang, Xiangying
    You, Guangzeng
    ELECTRONICS, 2020, 9 (06) : 1 - 22
  • [28] Generation Expansion Planning Considering Externalities for Large Scale Integration of Renewable Energy
    Khan, Akif Zia
    Sun Yingyun
    Ashfaq, Ahsan
    2014 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT ENERGY AND POWER SYSTEMS (IEPS), 2014, : 135 - 140
  • [29] An approach for evaluating the impact of an intermittent renewable energy source on transmission expansion planning
    Chatthaworn, Rongrit
    Chaitusaney, Surachai
    FRONTIERS OF INFORMATION TECHNOLOGY & ELECTRONIC ENGINEERING, 2015, 16 (10) : 871 - 882
  • [30] Transmission Network Expansion Planning Considering Uncertainties in Loads and Renewable Energy Resources
    Wen, Jinyu
    Han, Xingning
    Li, Jiaming
    Chen, Yan
    Yi, Haiqiong
    Lu, Chang
    CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2015, 1 (01): : 78 - 85