Using relative profits as an alternative to activity-based costing

被引:14
作者
Homburg, C [1 ]
机构
[1] Univ Cologne, Dept Management Accounting, D-50923 Cologne, Germany
关键词
relative profit; activity-based costing; data envelopment analysis; product evaluation; potential optimality;
D O I
10.1016/j.ijpe.2004.02.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Activity-based costing (ABC) tries to assign overhead costs to cost objects more accurately than traditional cost systems. However, due to its severe separability and proportionality assumptions using ABC for decision-making may lead to a considerable economic loss. To evaluate products on the basis of their activity-based costs, we therefore use a data envelopment analysis (DEA)-like approach which mainly separates the product portfolio into a set of potentially optimal and a set of non-potentially optimal products. In contrast to DEA, we do not need any ad hoc assumptions about the production possibility set or returns to scale. Furthermore, it will turn out that in contrast to conventional ABC, we will not have to determine the cost driver rates ex ante, reducing information cost. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:387 / 397
页数:11
相关论文
共 30 条
[21]   Structural comparison of data envelopment analysis and multiple objective linear programming [J].
Joro, T ;
Korhonen, P ;
Wallenius, J .
MANAGEMENT SCIENCE, 1998, 44 (07) :962-970
[22]  
KLOOCK J, 1997, MANAGE ACCOUNT RES, V8, P299, DOI DOI 10.1006/MARE.1996.0048
[23]   ARE OVERHEAD COSTS STRICTLY PROPORTIONAL TO ACTIVITY - EVIDENCE FROM HOSPITAL-SERVICE DEPARTMENTS [J].
NOREEN, E ;
SODERSTROM, N .
JOURNAL OF ACCOUNTING & ECONOMICS, 1994, 17 (1-2) :255-278
[24]  
Noreen Eric., 1991, Journal of Management Accounting Research, V3, P159
[25]   DATA ENVELOPMENT ANALYSIS ON A RELAXED SET OF ASSUMPTIONS [J].
PETERSEN, NC .
MANAGEMENT SCIENCE, 1990, 36 (03) :305-314
[26]  
RAIBORN C, 1996, MANAGERIAL ACCOUNTIN
[27]   Modelling resource supply and demand: Expanding the utility of ABC [J].
Salafatinos, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (03) :177-187
[28]   On the applicability of activity based costing as a planning instrument [J].
Schneeweiss, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 54 (03) :277-284
[29]   Activity-based costing and process modeling for cost-conscious product design:: A case study in a manufacturing company [J].
Tornberg, K ;
Jämsen, M ;
Paranko, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (01) :75-82
[30]   DECISION-MAKING WITH INCOMPLETE INFORMATION [J].
WEBER, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 28 (01) :44-57