System Dynamics-based Project Cost Risk Accession Control Modeling

被引:1
作者
Dong Jun [1 ]
Li Rong [1 ]
Wang Dongxue [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
来源
2018 EIGHTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC 2018) | 2018年
关键词
Three excesses" risk; System Dynamics; Engineering cost; CONSTRUCTION PROJECTS;
D O I
10.1109/IMCCC.2018.00024
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In recent years, with the rapid development of project investment, "three excesses" problems (that is "the design budget exceeds the investment estimation", "diagram budget exceeds design budget", "settlement exceeds diagram budget") are serious, which brings tremendous loss to country economic construction. This paper uses system dynamics method to analyze existing influencing factors of "three exceeds" problems and their risks basing on the understanding of engineering costs and risks in different stages. As for the problems in project pricing process, this paper makes a deep research on external environment, built process, and the project's related parties and etc. to find the existing influencing factors in the three cost excesses subsystems. According to risk causal feedback figure, the paper establishes a dynamics model and makes a quantitative evaluation of the risk factors. Aiming to make recommendations to effective control of the "Three excesses" risks in project construction, this paper has a certain reference value to improve investment efficiency.
引用
收藏
页码:81 / 86
页数:6
相关论文
共 11 条
[1]  
Chen Shiqing, 2013, J KAILI U, V31, P125
[2]  
Chen Zonglei, 2013, ENG ECON, P22
[3]   An exploration into cost-influencing factors on construction projects [J].
Cheng, Ying-Mei .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) :850-860
[4]  
Dikmen I., 2007, International Journal of Project Management, V25, P494, DOI 10.1016/j.ijproman.2006.12.002
[5]  
Dukic D, 2007, ITI, P107
[6]  
Kaming P. F., 1997, Construction Management and Economics, V15, P83, DOI DOI 10.1080/014461997373132
[7]   Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning [J].
Kim, GH ;
An, SH ;
Kang, KI .
BUILDING AND ENVIRONMENT, 2004, 39 (10) :1235-1242
[8]  
Pablo Aroeena, 2008, DEA APPROACH ENERGY, V30, P456
[9]   Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies [J].
Taylan, Osman ;
Bafail, Abdallah O. ;
Abdulaal, Reda M. S. ;
Kabli, Mohammed R. .
APPLIED SOFT COMPUTING, 2014, 17 :105-116
[10]  
Wang Xuejun, 2004, CHINESE J MANAGEMENT, P14