A Review of Energy-Efficient and Sustainable Construction Scheduling Supported with Optimization Tools

被引:6
作者
Dasovic, Borna [1 ]
Klansek, Uros [1 ]
机构
[1] Univ Maribor, Fac Civil Engn Transportat Engn & Architecture, Smetanova Ul 17, Maribor 2000, Slovenia
关键词
construction; project management; optimization tools; scheduling; sustainability; energy efficiency; RESOURCE-ALLOCATION; COST; TIME; ALGORITHM; QUALITY;
D O I
10.3390/en15072330
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This article reviews the accomplishments of studies in which optimization tools were used to develop energy-efficient and sustainable construction schedules. With the increase in global awareness of environmental issues, the construction industry has been forced to explore innovative techniques to make the building process more energy-efficient and sustainable. Project managers can use optimization tools in their scheduling procedures to address these issues in the early stages of the project. Therefore, this paper examines different optimization-based construction scheduling methods and their impact on schedule energy efficiency and the three key sustainability goals: economic viability, social equity, and environmental protection. Such a review has not yet been conducted to the best of our knowledge. This research aims to fill the gap and contribute to understanding advanced optimization tools that can pave the way to energy-efficient and sustainable scheduling practices. After a brief introduction, the background of optimization-based construction scheduling techniques that aim to improve construction management and incorporate these aspects into the decision-making process is explained. Then, these approaches are addressed in detail. It is determined for each study whether it adopted energy efficiency goals and which sustainability dimensions it considered within the proposed optimization model. The results of this study indicate a wide heuristic algorithms application for complex scheduling problems. Meanwhile, mathematical programming is still quite unexplored, especially methods that utilize algebraic modeling languages. This study provides a foundation for further research by addressing the current reach in development and possible knowledge gaps that could be researched in future studies. The paper also discusses the advantages and limitations of different approaches and illustrates the potential for utilizing these methods. Supported by the main review findings, conclusions and recommendations for further research are provided.
引用
收藏
页数:17
相关论文
共 48 条
[1]   Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic [J].
Anagnostopoulos, Konstantinos ;
Koulinas, Georgios .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (02) :204-213
[2]  
Anagnostopoulos KP, 2010, IEEE C EVOL COMPUTAT
[3]   A simulated annealing hyperheuristic for construction resource levelling [J].
Anagnostopoulos, Konstantinos P. ;
Koulinas, Georgios K. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (02) :163-175
[4]  
[Anonymous], 2021, 2021 Global Status Report for Buildings and Construction: Towards a Zero-emission, Efficient and Resilient Buildings and Construction Sector
[5]   Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach [J].
Banihashemi, Sayyid Ali ;
Khalilzadeh, Mohammad .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (07) :1979-2004
[6]   Knowledge-based minimization of railway infrastructures environmental impact [J].
Barrientos, Francisco ;
Moral, Alberto ;
Rodriguez, Jorge ;
Martinez, Carlos ;
Campo, Francisco ;
Carnerero, Roberto ;
Parra, Manuel ;
Benitez, Jose M. ;
Sainz, Gregorio .
TRANSPORT RESEARCH ARENA TRA2016, 2016, 14 :840-849
[7]   FBI inspired meta-optimization [J].
Chou, Jui-Sheng ;
Nguyen, Ngoc-Mai .
APPLIED SOFT COMPUTING, 2020, 93
[8]   Integrating a novel multiple-objective FBI with BIM to determine tradeoff among resources in project scheduling [J].
Dang-Trinh Nguyen ;
Jui-Sheng Chou ;
Duc-Hoc Tran .
KNOWLEDGE-BASED SYSTEMS, 2022, 235
[9]   Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling [J].
Dasovic, Borna ;
Klansek, Uros .
SUSTAINABILITY, 2021, 13 (21)
[10]   A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling [J].
Dasovic, Borna ;
Galic, Mario ;
Klansek, Uros .
SUSTAINABILITY, 2020, 12 (08)