Control-Scheduling Codesign Exploiting Trade-Off between Task Periods and Deadlines
被引:7
作者:
Cha, Hyun-Jun
论文数: 0引用数: 0
h-index: 0
机构:
Kookmin Univ, Grad Sch Automot Engn, 77 Jeongneung Ro, Seoul 02707, South KoreaKookmin Univ, Grad Sch Automot Engn, 77 Jeongneung Ro, Seoul 02707, South Korea
Cha, Hyun-Jun
[1
]
Jeong, Woo-Hyuk
论文数: 0引用数: 0
h-index: 0
机构:
Kookmin Univ, Dept Comp Sci, 77 Jeongneung Ro, Seoul 02707, South KoreaKookmin Univ, Grad Sch Automot Engn, 77 Jeongneung Ro, Seoul 02707, South Korea
Jeong, Woo-Hyuk
[2
]
Kim, Jong-Chan
论文数: 0引用数: 0
h-index: 0
机构:
Kookmin Univ, Grad Sch Automot Engn, 77 Jeongneung Ro, Seoul 02707, South KoreaKookmin Univ, Grad Sch Automot Engn, 77 Jeongneung Ro, Seoul 02707, South Korea
Kim, Jong-Chan
[1
]
机构:
[1] Kookmin Univ, Grad Sch Automot Engn, 77 Jeongneung Ro, Seoul 02707, South Korea
[2] Kookmin Univ, Dept Comp Sci, 77 Jeongneung Ro, Seoul 02707, South Korea
A control task's performance heavily depends on its sampling frequency and sensing-to-actuation delay. More frequent sampling, that is, shorter period, improves the control performance. Similarly, shorter delay also has a positive effect. Moreover, schedulability is also a function of periods and deadlines. By taking into account the control performance and schedulability at the same time, this paper defines a period and deadline selection problem for fixed-priority systems. Our problem is to find the optimal periods and deadlines for given tasks that maximize the overall system performance. As our solution, this paper presents a novel heuristic algorithm that finds a high-quality suboptimal solution with very low complexity, which makes the algorithm practically applicable to large size task sets.
引用
收藏
页数:11
相关论文
共 22 条
[21]
Xia F, 2008, ADV TOP SCI TECH CHI, P3
[22]
차현준, 2015, [Journal of The Korea Society of Computer and Information, 한국컴퓨터정보학회논문지], V20, P39