Scheduling products with subassemblies and changeover time

被引:0
作者
Hu, Xinxin [1 ]
Blocher, James D. [2 ]
Heese, Hans Sebastian [3 ]
Zhou, Feng [4 ]
机构
[1] Univ Houston Downtown, Houston, TX USA
[2] Indiana Univ, Bloomington, IN 47405 USA
[3] EBS Univ, Oestrich Winkel, Germany
[4] Calif State Univ Stanislaus, Turlock, CA 95382 USA
关键词
scheduling; single machine; changeover time; flow time; SINGLE-MACHINE; JOBS; COMPONENTS; FLOWSHOP; FACILITY; MINIMIZE;
D O I
10.1057/jors.2015.108
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We revisit the problem, previously studied by Coffman et al, of scheduling products with two subassemblies on a common resource, where changeovers consume time, under the objective of flow-time minimization. We derive some previously unidentified structural properties that could be important to researchers working on similar batch scheduling problems. We show that there exists a series of base schedules from which optimal schedules can be easily derived. As these base schedules build on each other, they are easy to construct as well. We also show that the structure of these base schedules is such that batch sizes decrease over time in a well-defined manner. These insights about the general form of the schedules might also be important to practitioners wanting some intuition about the schedule structure that they are implementing.
引用
收藏
页码:1025 / 1033
页数:9
相关论文
共 20 条
  • [1] A survey of scheduling problems with setup times or costs
    Allahverdi, Ali
    Ng, C. T.
    Cheng, T. C. E.
    Kovalyov, Mikhail Y.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 985 - 1032
  • [2] SCHEDULING THE PRODUCTION OF COMPONENTS AT A COMMON FACILITY
    BAKER, KR
    [J]. IIE TRANSACTIONS, 1988, 20 (01) : 32 - 35
  • [3] Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion time
    Cheng, T. C. E.
    Ng, C. T.
    Yuan, J. J.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 191 (02) : 320 - 331
  • [4] Batching in a two-stage flowshop with dedicated machines in the second stage
    Cheng, TCE
    Kovalyov, MY
    Chakhlevich, KN
    [J]. IIE TRANSACTIONS, 2004, 36 (01) : 87 - 93
  • [5] Single supplier scheduling for multiple deliveries
    Cheng, TCE
    Kovalyov, MY
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 107 (1-4) : 51 - 63
  • [6] Single machine batch scheduling with sequential job processing
    Cheng, TCE
    Kovalyov, MY
    [J]. IIE TRANSACTIONS, 2001, 33 (05) : 413 - 420
  • [7] Coffman E. G. Jr., 1990, Annals of Operations Research, V26, P135, DOI 10.1007/BF02248589
  • [8] OPTIMAL SCHEDULING OF PRODUCTS WITH 2 SUBASSEMBLIES ON A SINGLE-MACHINE
    COFFMAN, EG
    NOZARI, A
    YANNAKAKIS, M
    [J]. OPERATIONS RESEARCH, 1989, 37 (03) : 426 - 436
  • [9] BATCHING TO MINIMIZE FLOW TIMES ON ONE MACHINE
    DOBSON, G
    KARMARKAR, US
    RUMMEL, JL
    [J]. MANAGEMENT SCIENCE, 1987, 33 (06) : 784 - 799
  • [10] Scheduling the production of two-component jobs on a single machine
    Gerodimos, AE
    Glass, CA
    Potts, CN
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) : 250 - 259