The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty

被引:3
|
作者
Joshi, Devendra [1 ]
Gholami, Hamed [2 ]
Mohapatra, Hitesh [3 ]
Ali, Anis [4 ]
Streimikiene, Dalia [5 ]
Satpathy, Susanta Kumar [6 ]
Yadav, Arvind [1 ]
机构
[1] Koneru Lakshmaiah Educ Fdn, Dept CSE, Vaddeswaram 522302, Andhra Pradesh, India
[2] Univ Teknol Malaysia, Fac Engn, Dept Mfg & Ind Engn, Johor Baharu 81310, Malaysia
[3] KIIT Deemed Univ, Sch Comp Engn, Bhubaneswar 751024, Odisha, India
[4] Prince Sattam Bin Abdulaziz Univ, Coll Business Adm, Dept Management, Al Kharj 11942, Saudi Arabia
[5] Vilnius Univ, Kaunas Fac, Muitines 8, LT-44280 Kaunas, Lithuania
[6] Vignans Fdn Sci Technol & Res, Dept Comp Sci & Engn, Vadlamudi 522213, Andhra Pradesh, India
关键词
stochastic production scheduling; mixed integer programming; geological uncertainty; net present value; branch and cut; TRADITIONAL OPTIMIZATION; PIT; DESIGN; ALGORITHMS;
D O I
10.3390/su14169819
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The scheduling of open-pit mine production is a large-scale, mixed-integer linear programming problem that is computationally expensive. The purpose of this study is to create a computationally efficient algorithm for solving open-pit production scheduling problems with uncertain geological parameters. To demonstrate the effectiveness of the proposed research, a case study of an Indian iron ore mine is presented. Multiple realizations of the resource models were developed and integrated within the stochastic production scheduling framework to capture uncertainty and incorporate it into the mine plan. In this case study, two hybrid methods were developed to evaluate their performance. Model 1 is a combined branch and cut with the longest path, whereas Model 2 is a sequential parametric maximum flow and branch and cut. The results show that both methods produce similar materials, ore, metal, and risk profiles; however, Model 2 generates slightly more (4 percent) discounted cash flow from this study mine than Model 1. The results also show that Model 2's computational time is 46.64 percent less than that of Model 1.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Joint stochastic optimisation of stope layout, production scheduling and access network
    Penadillo, Cristina
    Dimitrakopoulos, Roussos
    Kumral, Mustafa
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2024, 133 (02) : 127 - 141
  • [22] An efficient optimization process for hydrocarbon production in presence of geological uncertainty using a clustering method: A case study on Brugge field
    Foroud, Toomaj
    Seifi, Abbas
    AminShahidy, Babak
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2016, 32 : 476 - 490
  • [23] An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
    Joshi, Devendra
    Chithaluru, Premkumar
    Singh, Aman
    Yadav, Arvind
    Elkamchouchi, Dalia H.
    Brenosa, Jose
    Anand, Divya
    MATHEMATICS, 2022, 10 (21)
  • [24] An Application of Branch and Cut to Open Pit Mine Scheduling
    Louis Caccetta
    Stephen P. Hill
    Journal of Global Optimization, 2003, 27 : 349 - 365
  • [25] An application of Branch and Cut to open pit mine scheduling
    Caccetta, L
    Hill, SP
    JOURNAL OF GLOBAL OPTIMIZATION, 2003, 27 (2-3) : 349 - 365
  • [26] Optimisation of Petroleum Production ell Placement under Geological Uncertainty
    Epelle, Emmanuel, I
    Gerogiorgis, Dimitrios, I
    30TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A-C, 2020, 48 : 1243 - 1248
  • [27] A Novel Large-Scale Stochastic Pushback Design Merged with a Minimum Cut Algorithm for Open Pit Mine Production Scheduling
    Joshi, Devendra
    Chithaluru, Premkumar
    Singh, Aman
    Yadav, Arvind
    Elkamchouchi, Dalia H.
    Perez-Oleaga, Cristina Mazas
    Anand, Divya
    SYSTEMS, 2022, 10 (05):
  • [28] A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty
    Jelvez, Enrique
    Ortiz, Julian
    Varela, Nelson Morales
    Askari-Nasab, Hooman
    Nelis, Gonzalo
    MATHEMATICS, 2023, 11 (18)
  • [29] A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
    Tolouei, K.
    Moosavi, E.
    Tabrizi, A. H. Bangian
    Afzal, P.
    Bazzazi, A. Aghajani
    JOURNAL OF MINING AND ENVIRONMENT, 2020, 11 (03): : 721 - 736
  • [30] Efficient Ensemble-Based Stochastic Gradient Methods for Optimization Under Geological Uncertainty
    Jeong, Hoonyoung
    Sun, Alexander Y.
    Jeon, Jonghyeon
    Min, Baehyun
    Jeong, Daein
    FRONTIERS IN EARTH SCIENCE, 2020, 8