Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming

被引:214
作者
Chen, Tzu-Li [1 ]
Cheng, Chen-Yang [2 ]
Chou, Yi-Han [1 ]
机构
[1] Fu Jen Catholic Univ, Dept Informat Management, Taipei 242, Taiwan
[2] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei, Taiwan
关键词
Hybrid flow shop scheduling; Lot streaming; Energy efficiency; Genetic algorithm; POWER-CONSUMPTION; COMPLETION-TIME; TOTAL TARDINESS; SINGLE-JOB; 2-STAGE; MINIMIZE; SYSTEM; FRAMEWORK; MODEL;
D O I
10.1007/s10479-018-2969-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Hybrid flow shop scheduling problems are encountered in many real-world manufacturing operations such as computer assembly, TFT-LCD module assembly, and solar cell manufacturing. Most research considers the scheduling problem in regard to time requirements and the steps needed to improve production efficiency. However, the increasing amount of carbon emissions worldwide is contributing to the worsening global warming problem. Many countries and international organizations have started to pay attention to this problem, even creating mechanisms to reduce carbon emissions. Furthermore, manufacturing enterprises are showing growing interest in realizing energy savings. Thus, the present research study focuses on reducing energy costs and completion time at the manufacturing-system level. This paper proposed a multi-objective mixed-integer programming for energy-efficient hybrid flow shop scheduling with lot streaming in order to minimize both the production makespan and electric power consumption. Due to a trade-off between these objectives and the computational complexity of the proposed multi-objective mixed-integer program, this study adopts the genetic algorithm (GA) to obtain approximate Pareto solutions more efficiently. In addition, a multi-objective energy efficiency scheduling algorithm is also developed to calculate the fitness values of each chromosome in GA.
引用
收藏
页码:813 / 836
页数:24
相关论文
共 54 条
[1]   BPSS - A SCHEDULING SUPPORT SYSTEM FOR THE PACKAGING INDUSTRY [J].
ADLER, L ;
FRAIMAN, N ;
KOBACKER, E ;
PINEDO, M ;
PLOTNICOFF, JC ;
WU, TP .
OPERATIONS RESEARCH, 1993, 41 (04) :641-648
[2]   A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES [J].
BAKER, KR ;
JIA, D .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (05) :561-566
[3]   LOT STREAMING IN THE 2-MACHINE FLOW-SHOP WITH SETUP TIMES [J].
BAKER, KR .
ANNALS OF OPERATIONS RESEARCH, 1995, 57 :1-11
[4]  
Blackburn J.D., 1991, TIME BASED COMPETITI
[5]  
Bockerstette J.A., 1993, Time Based Manufacturing
[6]   A comprehensive review of lot streaming [J].
Chang, JH ;
Chiu, HN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (08) :1515-1536
[7]   Lot streaming models with a limited number of capacitated transporters in multistage batch production systems [J].
Chiu, HN ;
Chang, JH ;
Lee, CH .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (12) :2003-2020
[8]   Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm [J].
Dai, Min ;
Tang, Dunbing ;
Giret, Adriana ;
Salido, Miguel A. ;
Li, W. D. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2013, 29 (05) :418-429
[9]   A parallel genetic algorithm for dynamic cell formation in cellular manufacturing systems [J].
Defersha, F. M. ;
Chen, M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (22) :6389-6413
[10]   Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem [J].
Defersha, Fantahun Melaku ;
Chen, Mingyuan .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (1-4) :249-265