The stochastic economic lot scheduling problem: A survey

被引:60
作者
Winands, E. M. M. [1 ]
Adan, I. J. B. F. [2 ]
van Houtum, G. J. [3 ]
机构
[1] Vrije Univ Amsterdam, Dept Math, NL-1081 HV Amsterdam, Netherlands
[2] Eindhoven Univ Technol, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
[3] Eindhoven Univ Technol, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
关键词
Inventory theory; Production systems; Stochastic economic lot scheduling problem; BASE-STOCK POLICIES; MULTIITEM PRODUCTION SYSTEMS; MULTIPRODUCT KANBAN SYSTEMS; MACHINE PRODUCTION SYSTEMS; DYNAMIC CYCLIC POLICIES; HEAVY TRAFFIC ANALYSIS; MAKE-TO-ORDER; SINGLE-MACHINE; LOST SALES; BATCH-PRODUCTION;
D O I
10.1016/j.ejor.2010.06.011
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The present literature survey focuses on the stochastic economic lot scheduling problem (SELSP). The SELSP deals with the make-to-stock production of multiple standardized products on a single machine with limited capacity under random demands, possibly random setup times and possibly random production times. The main task of a production manager in this setting is the construction of a production plan for the machine. Based on the critical elements of such a production plan, we present a classification and extensive overview of the research on the SELSP together with an indication of open research areas. By doing so, we intend to stimulate the discussion on the important problems concerning the SELSP both from a theoretical and a practical point of view. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:1 / 9
页数:9
相关论文
共 63 条
[1]   Combining make to order and make to stock [J].
Adan, IJBF ;
van der Wal, J .
OR SPEKTRUM, 1998, 20 (02) :73-81
[2]  
Altiok T, 2000, IIE TRANS, V32, P115, DOI 10.1023/A:1007654113063
[3]  
ALTIOK T, 1995, NAV RES LOG, V42, P889, DOI 10.1002/1520-6750(199509)42:6<889::AID-NAV3220420604>3.0.CO
[4]  
2-1
[5]   SINGLE-STAGE, MULTIPRODUCT PRODUCTION INVENTORY SYSTEMS WITH BACKORDERS [J].
ALTIOK, T ;
SHIUE, GA .
IIE TRANSACTIONS, 1994, 26 (02) :52-61
[6]   On the stability of timed token rings [J].
Altman, E ;
Liu, Z .
PERFORMANCE EVALUATION, 1996, 26 (03) :219-234
[7]  
Anupindi R., 1998, Operations Research, V46, pS98, DOI 10.1287/opre.46.3.S98
[8]   THE STRATEGIC USE OF CAPACITY SLACK IN THE ECONOMIC LOT SCHEDULING PROBLEM WITH RANDOM DEMAND [J].
BOURLAND, KE ;
YANO, CA .
MANAGEMENT SCIENCE, 1994, 40 (12) :1690-1704
[9]  
BOURLAND KE, 1994, 299 A TUCK SCH BUS A
[10]  
Bradley JR, 2003, PROD OPER MANAG, V12, P464