Truck scheduling in multi-door cross docking terminal by modified particle swarm optimization

被引:42
作者
Wisittipanich, Warisa [1 ]
Hengmeechai, Piya [1 ]
机构
[1] Chiang Mai Univ, Fac Engn, Ind Engn Dept, 239 Huay Keaw Rd, Chiang Mai 50200, Thailand
关键词
Multi-door; Cross docking; Particle swarm optimization; Truck scheduling; Makespan; OUTBOUND TRUCKS; ALGORITHM; MAKESPAN; SYSTEMS;
D O I
10.1016/j.cie.2017.01.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In today's distribution environment, one of the main strategies is to minimize cost by reducing inventory and timely shipments. Cross docking is a logistic management strategy in which products delivered to a distribution center by inbound trucks are immediately loaded to outbound trucks with minimum handling and storage time so that the total cost can be reduced. In a multi-door cross docking terminal, one of the most important operational management problems is the truck scheduling problem which is decomposed to the assignment of trucks to dock doors and the sequence of all inbound and outbound trucks. In this paper, a mathematical model of mixed integer programming for door assigning and truck sequencing in a multi-door cross docking system is presented. The objective of the model is to minimize total operational time or makespan. Then, the modified particle swarm optimization, so called GLNPSO, is proposed with particular encoding and decoding schemes for solving the truck scheduling problem in a multi-door cross docking system. The performances of GLNPSO are evaluated and compared the results with those obtained from the original PSO. The experimental results show that the GLNPSO is capable of finding high quality solutions with fast convergence. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:793 / 802
页数:10
相关论文
共 23 条
[1]   Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage [J].
Arabani, A. R. Boloori ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (03) :1964-1979
[2]   A multi-criteria cross-docking scheduling with just-in-time approach [J].
Arabani, A. R. Boloori ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8) :741-756
[3]   Cross dock scheduling: Classification, literature review and research agenda [J].
Boysen, Nils ;
Fliedner, Malte .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2010, 38 (06) :413-422
[4]   Scheduling inbound and outbound trucks at cross docking terminals [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
OR SPECTRUM, 2010, 32 (01) :135-161
[5]   Minimizing makespan in two-stage hybrid cross docking scheduling problem [J].
Chen, Feng ;
Song, Kailei .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) :2066-2073
[6]   Minimizing the makespan in a two-machine cross-docking flow shop problem [J].
Chen, Feng ;
Lee, Chung-Yee .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (01) :59-72
[7]  
Kennedy J, 1995, 1995 IEEE INTERNATIONAL CONFERENCE ON NEURAL NETWORKS PROCEEDINGS, VOLS 1-6, P1942, DOI 10.1109/icnn.1995.488968
[8]   An improved mathematical model and a hybrid metaheuristic for truck scheduling in cross-dock problems [J].
Keshtzari, M. ;
Naderi, B. ;
Mehdizadeh, E. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 91 :197-204
[9]   Optimizing truck sequencing and truck dock assignment in a cross docking system [J].
Kuo, Yiyo .
EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (14) :5532-5541
[10]  
Liu ZX, 2007, ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 3, PROCEEDINGS, P799