A Study on Risk Management in Reservoir Operation Project

被引:0
作者
Gao Jun [1 ]
Liu Xiantao [1 ]
Li Wenjing [1 ]
机构
[1] SW Petr Univ, Sch Econ & Management, Chengdu, Peoples R China
来源
ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2 | 2010年
关键词
Reservoir Operation; Risk Management; Project Management;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In reservoir operation project, it is important to carry out risk management for the purpose of cutting down risk, reducing loss and obtaining maximum investment income. Based on the features of the reservoir operation project, this article has established basic concepts of risk management in reservoir operation project, designed the basic process of risk management and analyzed the relevant personnel allocation.
引用
收藏
页码:98 / 101
页数:4
相关论文
共 50 条
  • [41] A risk management approach for collaborative NPD project
    Deniaud, Ioana Filipas
    Marmier, Francois
    Gourc, Didier
    Bougaret, Sophie
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [42] mPRIME -: Multiple project Risk Management tool
    Gomes de Gusmao, Cristine martins
    de Moura, Hermano Perrelli
    Information Technology Management from a Business Perspective, 2007, : 100 - 101
  • [44] Risk management in high-tech project
    Ling, Chuanfan
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2006, : 641 - 646
  • [45] Risk assessment in oilfield services project management
    Radisic, Mladen
    Radisic, Ognjen
    Radisic, Maja
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2021, 28 (01) : 80 - 100
  • [46] A study of the impact of project classification on project risk indicators
    Yim, Rachel
    Castaneda, Jason
    Doolen, Toni
    Tumer, Irem
    Malak, Richard
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (04) : 863 - 876
  • [47] Simulation Based Fuzzy Model for Operation of a Reservoir Project A Case Study of Sukhi Dam, Gujarat, India
    Joshi, Geeta S.
    Sharma, VikashKumar
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: WATERSHED MANAGEMENT, IRRIGATION AND DRAINAGE, AND WATER RESOURCES PLANNING AND MANAGEMENT, 2017, : 328 - 339
  • [48] Incorporating risk management in project management
    Hui, EYY
    Proceedings of the 4th International Conference on Quality & Reliability, 2005, : 17 - 24
  • [49] Recent Advances in Adaptive Catchment Management and Reservoir Operation
    Fu, Guangtao
    Ni, Guangheng
    Zhang, Chi
    WATER, 2019, 11 (03)
  • [50] Incorporating inflow uncertainty into risk assessment for reservoir operation
    Xu, ZX
    Ito, K
    Liao, S
    Wang, L
    STOCHASTIC HYDROLOGY AND HYDRAULICS, 1997, 11 (05): : 433 - 448