SFS: Server-based Flow Scheduling for Minimizing Datacenter Flow Completion Times

被引:0
|
作者
Zhang, Jie [1 ]
Zhang, Dafang [1 ]
Huang, Kun [2 ]
机构
[1] Hunan Univ, Coll Comp Sci & Elect Engn, Changsha 410082, Hunan, Peoples R China
[2] Chinese Acad Sci, Inst Comp Technol, Beijing 100864, Peoples R China
来源
2015 IEEE CONFERENCE ON COMPUTER COMMUNICATIONS WORKSHOPS (INFOCOM WKSHPS) | 2015年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Minimizing flow completion times (FCT) is a critical issue in datacenter networks. Existing approaches either fail to minimize FCT (i.e., DCTCP) or are costly to deploy (i.e., pFabric). This paper presents a server-based flow scheduling (SFS) scheme for enabling easy and rapid deployment in servers while almost retaining the same minimal FCT as state-of-the-art pFabric. To achieve the goal, SFS uses three novel techniques: receiver-driven flow scheduling, sender-side flow scheduling, and most recently seen flow coordination. With SFS, each sender or receiver keeps the highest-priority flow active and pauses the other low-priority ones, such that flows are completed one by one for minimizing FCT. Experimental results on NS2 show that SFS outperforms DCTCP and approaches pFabric in FCT.
引用
收藏
页码:73 / 74
页数:2
相关论文
共 50 条
  • [21] A new heuristic for minimizing total completion time objective in permutation flow shop scheduling
    Dipak Laha
    Arindam Chakravorty
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 1189 - 1197
  • [22] The Two-machine Flow-shop Scheduling Problem with a Single Server and Unit Server Times
    Ling, Shi
    Guang, Cheng Xue
    JOURNAL OF INFORMATICS AND MATHEMATICAL SCIENCES, 2012, 4 (01): : 123 - 127
  • [23] Detection of Change Frequency in Web Pages to Optimize Server-based Scheduling
    Meegahapola, Lakmal
    Alwis, Roshan
    Nimalarathna, Eranga
    Mallawaarachchi, Vijini
    Meedeniya, Dulani
    Jayarathna, Sampath
    2017 17TH INTERNATIONAL CONFERENCE ON ADVANCES IN ICT FOR EMERGING REGIONS (ICTER) - 2017, 2017, : 165 - 171
  • [24] Scheduling with non-renewable resources: minimizing the sum of completion times
    Berczi, Kristof
    Kiraly, Tamas
    Omlor, Simon
    JOURNAL OF SCHEDULING, 2024, 27 (02) : 151 - 164
  • [25] DeTail: Reducing the Flow Completion Time Tail in Datacenter Networks
    Zats, David
    Das, Tathagata
    Mohan, Prashanth
    Borthakur, Dhruba
    Katz, Randy
    ACM SIGCOMM COMPUTER COMMUNICATION REVIEW, 2012, 42 (04) : 139 - 150
  • [26] Scheduling with non-renewable resources: minimizing the sum of completion times
    Kristóf Bérczi
    Tamás Király
    Simon Omlor
    Journal of Scheduling, 2024, 27 : 151 - 164
  • [27] Approximation algorithms for coupled task scheduling minimizing the sum of completion times
    David Fischer
    Péter Györgyi
    Annals of Operations Research, 2023, 328 : 1387 - 1408
  • [28] Approximation algorithms for coupled task scheduling minimizing the sum of completion times
    Fischer, David
    Gyorgyi, Peter
    ANNALS OF OPERATIONS RESEARCH, 2023, 328 (02) : 1387 - 1408
  • [29] Improving Flow Completion Time for Short Flows in Datacenter Networks
    Joy, Sijo
    Nayak, Amiya
    PROCEEDINGS OF THE 2015 IFIP/IEEE INTERNATIONAL SYMPOSIUM ON INTEGRATED NETWORK MANAGEMENT (IM), 2015, : 700 - 705
  • [30] Automatic Algorithm Configuration for the Permutation Flow Shop Scheduling Problem Minimizing Total Completion Time
    Brum, Artur
    Ritt, Marcus
    EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, EVOCOP 2018, 2018, 10782 : 85 - 100