共 6 条
[1]
Guangli Feng, 2013, Advanced Materials Research, V756-759, P3194, DOI 10.4028/www.scientific.net/AMR.756-759.3194
[2]
Li X, 2012, J CONVERGENCE INFORM, V7, P236
[3]
The fast estimation model of project cost based on BP neural network
[J].
2013 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM DESIGN AND ENGINEERING APPLICATIONS (ISDEA),
2013,
:1449-1451
[4]
Xin He, 2011, Advanced Materials Research, V243-249, P6296, DOI 10.4028/www.scientific.net/AMR.243-249.6296
[5]
Yilin Wang, 2013, Advanced Materials Research, V756-759, P1696, DOI 10.4028/www.scientific.net/AMR.756-759.1696
[6]
[于靖 Yu Jing], 2006, [弹箭与制导学报, Journal of Projectiles, Rockets, Missiles and Guidance], V26, P354