Real-time scheduling of multi-stage flexible job shop floor

被引:24
|
作者
Ham, Myoungsoo [1 ]
Lee, Young Hoon [2 ]
Kim, Sun Hoon [2 ]
机构
[1] Samsung Austin Semicond, Syst Engn, Austin, TX USA
[2] Yonsei Univ, Dept Informat & Ind Engn, Seoul 120749, South Korea
关键词
job shop; integer programming; multi-stage; optimisation; real-time; scheduling; BATCH PLANTS; FORMULATION; ALGORITHMS; MACHINES; MODELS; SYSTEM;
D O I
10.1080/00207543.2010.492797
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper first formulates a binary integer programming (BIP) model that minimises Cmax for a multi-stage flexible job shop floor with machine compatibility. Due to a computational limitation, the exact optimal model is then relaxed as a linear programming model. The output from the relaxation model then turns into the objective of the BIP-based real-time scheduling (RTS) heuristic model. The RTS heuristic requires an iteration to calculate the final Cmax. At each iteration, the RTS heuristic assigns just one job to the earliest available machines. Since the set of jobs and machines included in the RTS model is relatively small, RTS can be solved in a very short computational time. We evaluate an overall effectiveness (in terms of solution quality and run time) of the RTS heuristic by way of computer experiments.
引用
收藏
页码:3715 / 3730
页数:16
相关论文
共 50 条
  • [1] Hierarchical Reinforcement Learning for Multi-Objective Real-Time Flexible Scheduling in a Smart Shop Floor
    Chang, Jingru
    Yu, Dong
    Zhou, Zheng
    He, Wuwei
    Zhang, Lipeng
    MACHINES, 2022, 10 (12)
  • [2] Job shop scheduling in real-time cases
    Shugang, L
    Zhiming, W
    Xiaohong, P
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (7-8) : 870 - 875
  • [3] Job shop scheduling in real-time cases
    Li Shugang
    Wu Zhiming
    Pang Xiaohong
    The International Journal of Advanced Manufacturing Technology, 2005, 26 : 870 - 875
  • [4] Research on Flexible Job-shop Scheduling Base on Real-time Information
    Zhang Qinghua
    Hu Zhentao
    Cheng Jing
    PROCEEDINGS OF THE 2015 10TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, 2015, : 569 - 574
  • [5] A Dynamic Approach to Multi-stage Job Shop Scheduling in an Industry 4.0-Based Flexible Assembly System
    Ivanov, Dmitry
    Dolgui, Alexandre
    Sokolov, Boris
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO INTELLIGENT, COLLABORATIVE AND SUSTAINABLE MANUFACTURING, 2017, 513 : 475 - 482
  • [6] Real-time dynamic shop floor scheduling using Evolutionary Algorithms
    Käschel, J
    Teich, T
    Zacher, B
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (02) : 113 - 120
  • [7] A memetic NSGA-II for the multi-objective flexible job shop scheduling problem with real-time energy tariffs
    Burmeister, Sascha Christian
    Guericke, Daniela
    Schryen, Guido
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 36 (04) : 1530 - 1570
  • [8] Machine learning algorithms benchmarking for real-time fault predictable scheduling on a shop floor
    Wu, Wenda
    Ji, Wei
    Wang, Lihui
    Gao, Liang
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2021, 16 (01) : 1 - 20
  • [9] Evolutionary game based real-time scheduling for energy-efficient distributed and flexible job shop
    Wang, Jin
    Liu, Yang
    Ren, Shan
    Wang, Chuang
    Wang, Wenbo
    JOURNAL OF CLEANER PRODUCTION, 2021, 293
  • [10] Multi-Task Multi-Agent Reinforcement Learning for Real-Time Scheduling of a Dual-Resource Flexible Job Shop with Robots
    Zhu, Xiaofei
    Xu, Jiazhong
    Ge, Jianghua
    Wang, Yaping
    Xie, Zhiqiang
    PROCESSES, 2023, 11 (01)