GA optimization model for repetitive projects with soft logic

被引:61
作者
Fan, Su-Ling [2 ]
Sun, Kuo-Shun [1 ]
Wang, Yu-Ren [3 ]
机构
[1] Kainan Univ, Dept Air Transportat, Zhongli City, Taoyuan County, Taiwan
[2] Tamkang Univ, Dept Civil Engn, Tamsui, Taipei County, Taiwan
[3] Natl Kaohsiung Univ Appl Sci, Dept Civil Engn, Kaohsiung 807, Taiwan
关键词
Construction scheduling; Repetitive project; Soft logic; Time cost trade-off; Genetic algorithms; COST TRADE-OFF; GENETIC ALGORITHM; CONSTRUCTION PROJECTS; MULTIOBJECTIVE APPROACH; SCHEDULING MODEL; LINEAR PROJECTS; NEURAL-NETWORK; TIME;
D O I
10.1016/j.autcon.2011.06.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a Genetic Algorithm (GA) based optimization model for repetitive projects when considering soft logic. There have been several models developed for Time-cost Trade-Off optimization in repetitive projects and these models were set up to search for optimum output rate that yields the minimum total cost for each project. Previous researches are based on the assumption that work sequence cannot be changed for different work zones. In reality, work sequence between work zones are not fixed (actually, constantly adjusted) throughout the project. Instead, they are often changed to shorten the construction time and minimize the total cost. Scheduling with the non-fixed work sequences between work zones is known as the soft logic method. Considering the soft logic in repetitive projects, the proposed GA model aims to assist the project team to find the minimum overall cost subjecting to different output rates and logical sequences. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:253 / 261
页数:9
相关论文
共 32 条
[1]   Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[2]   A two-phase GA model for resource-constrained project scheduling [J].
Chen, Po-Han ;
Weng, Haijie .
AUTOMATION IN CONSTRUCTION, 2009, 18 (04) :485-498
[3]   Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos [J].
Cheng, Chun-Tian ;
Wang, Wen-Chuan ;
Xu, Dong-Mei ;
Chau, K. W. .
WATER RESOURCES MANAGEMENT, 2008, 22 (07) :895-909
[4]   A time-cost trade-off model with resource consideration using genetic algorithm [J].
Chua, DKH ;
Chan, WT ;
Govindan, K .
CIVIL ENGINEERING SYSTEMS, 1997, 14 (04) :291-311
[5]   Fuzzy-based MOGA approach to stochastic time-cost trade-off problem [J].
Eshtehardian, Ehsan ;
Afshar, Abbas ;
Abbasnia, Reza .
AUTOMATION IN CONSTRUCTION, 2009, 18 (05) :692-701
[6]   Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects [J].
Ezeldin, A. Samer ;
Soliman, Ahmed .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (01) :42-55
[7]   Development of an object-oriented scheduling model for construction projects [J].
Fan, SL ;
Tserng, HP ;
Wang, MT .
AUTOMATION IN CONSTRUCTION, 2003, 12 (03) :283-302
[8]   Using genetic algorithms to solve construction time-cost trade-off problems [J].
Feng, CW ;
Liu, LA ;
Burns, SA .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) :184-189
[9]   Evolutionary resource scheduler for linear projects [J].
Georgy, Maged E. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (05) :573-583
[10]  
Goldberg DE., 1989, GENETIC ALGORITHMS S, V13