Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem

被引:16
|
作者
Kannimuthu, Marimuthu [1 ,2 ]
Raphael, Benny [1 ]
Ekambaram, Palaneeswaran [2 ]
Kuppuswamy, Ananthanarayanan [1 ]
机构
[1] Indian Inst Technol Madras, Dept Civil Engn, Chennai, Tamil Nadu, India
[2] Swinburne Univ Technol, Dept Civil & Construct Engn, Melbourne, Vic, Australia
关键词
Optimization; Scheduling; Project management; Decision support systems; Construction planning; TRADE-OFF PROBLEMS; GENETIC ALGORITHM; DECISION-MAKING; OPTIMIZING TIME; COST; CONSTRUCTION; QUALITY; RULES; PERFORMANCE; SYSTEM;
D O I
10.1108/ECAM-03-2019-0156
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Construction firms keep minimal resources to maintain productive working capital. Hence, resources are constrained and have to be shared among multiple projects in an organization. Optimal allocation of resources is a key challenge in such situations. Several approaches and heuristics have been proposed for this task. The purpose of this paper is to compare two approaches for multi-mode resource-constrained project scheduling in a multi-project environment. These are the single-project approach (portfolio optimization) and the multi-project approach (each project is optimized individually, and then heuristic rules are used to satisfy the portfolio constraint). Design/methodology/approach A direct search algorithm called Probabilistic Global Search Lausanne is used for schedule optimization. Multiple solutions are generated that achieve different trade-offs among the three criteria, namely, time, cost and quality. Good compromise solutions among these are identified using a multi-criteria decision making method, Relaxed Restricted Pareto Version 4. The solutions obtained using the single-project and multi-project approaches are compared in order to evaluate their advantages and disadvantages. Data from two sources are used for the evaluation: modified multi-mode resource-constrained project scheduling problem data sets from the project scheduling problem library (PSPLIB) and three real case study projects in India. Findings Computational results prove the superiority of the single-project approach over heuristic priority rules (multi-project approach). The single-project approach identifies better solutions compared to the multi-project approach. However, the multi-project approach involves fewer optimization variables and is faster in execution. Originality/value An integer programming model was developed in this research to optimize the multiple objectives in a multi-project environment considering explicit resource constraints and maximum daily costs constraints. This model was used to compare the performance of the two multi-project environment approaches. Unlike existing work in this area, the model used to predict the quality of activity execution modes is based on data collected from real construction projects.
引用
收藏
页码:893 / 916
页数:24
相关论文
共 50 条
  • [1] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [2] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [3] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [4] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [5] Modeling of the flexible resource-constrained multi-mode project scheduling problem
    School of Management, Wuhan University of Technology, Wuhan 430070, China
    不详
    Wuhan Ligong Daxue Xuebao, 2008, 11 (176-179+188):
  • [6] The Multi-Mode Resource-Constrained Multi-Project Scheduling ProblemThe MISTA 2013 challenge
    Tony Wauters
    Joris Kinable
    Pieter Smet
    Wim Vancroonenburg
    Greet Vanden Berghe
    Jannes Verstichel
    Journal of Scheduling, 2016, 19 : 271 - 283
  • [7] A robust optimization approach for the multi-mode resource-constrained project scheduling problem
    Balouka, Noemie
    Cohen, Izack
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 457 - 470
  • [8] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [9] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [10] Multi-mode resource-constrained project scheduling problem with activities overlapping
    Chu Z.
    Xu Z.
    Yu J.
    Xu, Zhe (xuzhebuaa@163.com), 1600, CIMS (23): : 557 - 566