Leveraging water infrastructure asset management for energy recovery and leakage reduction

被引:20
作者
Bonthuys, Gideon Johannes [1 ,2 ]
van Dijk, Marco [2 ]
Cavazzini, Giovanna [3 ]
机构
[1] I Consulting Pty Ltd, Asset Management Operat Unit, Block Nat,Block B,472 Botterklapper St, Pretoria, South Africa
[2] Univ Pretoria, Dept Civil Engn, Lynnwood Rd, Pretoria, South Africa
[3] Univ Padua, Dept Ind Engn, Via Venezia 1, I-35131 Padua, Italy
关键词
Energy recovery; Leakage reduction; Asset management; Municipal water infrastructure; DISTRIBUTION-SYSTEMS; PRESSURE; HYDROPOWER; TURBINES; INDUSTRY; PUMPS; CITY;
D O I
10.1016/j.scs.2019.101434
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this paper is to bridge the gap between the awareness of potential for energy recovery within Municipal Water Distribution Systems and the lack of knowledge of the extent and location of such potential so as to increase the sustainability and resilience of South African cities. This is done by leveraging asset management data, contained within municipal infrastructure asset registers and asset management plans, to identify energy recovery and leakage reduction potential. Data from asset registers and customer profiling within the municipal asset management plans were used to develop a hydraulic model for a municipal water distribution system. The customer service charter within the asset management plans describes the level of service, which was used in evaluating minimum operating pressures within the system. Comparing this to a pressure profile from the hydraulic analysis of the model, identifies excess pressure areas, exploitable for energy recovery. The novelty of this research is the exploitation of asset management data from Infrastructure Asset Management Plans and Asset Registers for the development of a hydraulic model to analyse energy recovery and leakage potential within a municipal water distribution system. Asset management data were used to identify an average annual preliminary energy recovery potential within the Polokwane Central District Metered Area of 2.3 GWh, resulting in an average annual leakage reduction potential between 3.3% and 4.2% of potable water, adding to the asset management value chain.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] Life Cycle Cost Method for Safe and Effective Infrastructure Asset Management
    Oh, WonJoon
    Cho, ChoongYeun
    Lee, MinJae
    BUILDINGS, 2023, 13 (08)
  • [42] Integrating resilience into asset management of infrastructure systems with a focus on building facilities
    Izaddoost, Ali
    Naderpajouh, Nader
    Heravi, Gholamreza
    JOURNAL OF BUILDING ENGINEERING, 2021, 44 (44):
  • [43] Resilience of civil infrastructure systems: literature review for improved asset management
    Gay, Leon F.
    Sinha, Sunil K.
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2013, 9 (04) : 330 - 350
  • [44] A national survey and roadmap on complete streets infrastructure asset management policy
    Gadsby, April
    Knezevich, Ronald
    Yu, Pingzhou Lucas
    Tsai, Yichang James
    Harvey, John
    TRANSPORT POLICY, 2024, 157 : 86 - 97
  • [45] A Framework of Life-Cycle Infrastructure Digitalization for Highway Asset Management
    Huang, Yeran
    Gao, Jian
    Wang, Lin
    Zhu, Jierui
    Li, Wanjun
    SUSTAINABILITY, 2025, 17 (03)
  • [46] A layered approach to model interconnected infrastructure and its significance for asset management
    Bhamidipati, Srirama
    van der Lei, Telli
    Herder, Paulien
    EUROPEAN JOURNAL OF TRANSPORT AND INFRASTRUCTURE RESEARCH, 2016, 16 (01): : 254 - 272
  • [47] Development of an assessment tool for infrastructure asset management of urban drainage systems
    Igroufa, Meriem
    Benzerra, Abbas
    Seghir, Abdelghani
    WATER SCIENCE AND TECHNOLOGY, 2020, 82 (03) : 537 - 548
  • [48] Sewerage infrastructure asset management based on a consumer-centric approach
    Hanseul Jo
    Jaena Ryu
    Jungwoo Shin
    Environmental Science and Pollution Research, 2022, 29 : 53009 - 53021
  • [49] A Leakage Reduction Scheme for Single Phase Energy-Recovery Memory Using Dual Threshold CMOS
    Hu, Jianping
    Sheng, Xiaolei
    2011 INTERNATIONAL CONFERENCE ON ELECTRONICS, COMMUNICATIONS AND CONTROL (ICECC), 2011, : 2421 - 2424
  • [50] Barriers and opportunities towards monitoring and asset management of EU transport infrastructure
    Scibilia, Elena
    Hoff, Inge
    De Urquia, Miguel A.
    Bigaj-Van Vliet, Agnieszka
    EUROPEAN ASSOCIATION ON QUALITY CONTROL OF BRIDGES AND STRUCTURES, EUROSTRUCT 2023, VOL 6, ISS 5, 2023, : 491 - 497