Scheduling algorithm searching only the feasible production sequences for complex batch processes with storage tanks

被引:1
作者
Murakami, Y [1 ]
Okada, M
Uchiyama, H
Hasebe, S
Hashimot, I
机构
[1] Kansai Univ, Dept Mech Syst Engn, Osaka 5648680, Japan
[2] Kyoto Univ, Dept Chem Engn, Kyoto 6068501, Japan
关键词
process systems engineering; scheduling; simulated annealing; combinatorial optimization; intermediate storage tanks;
D O I
10.1252/kakoronbunshu.24.578
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In chemical batch processes, the feasibility of the production sequence of jobs on successive units depends on the number of storage tanks between the units. When some jobs take different production paths between two batch units, it is more difficult to judge whether the production sequence of jobs is feasible or not. In this paper, for the process which has a complicated flow structure and many storage tanks, the condition that the feasible production sequence must satisfy is derived. Then, using the derived condition, a scheduling algorithm based on the simulated annealing method is improved so that the algorithm searches only the feasible production sequences. The improved algorithm has been applied to a practical large scheduling problem, and it has become clearer that plausible schedules can be generated with a shorter computing time.
引用
收藏
页码:578 / 584
页数:7
相关论文
共 7 条
[1]  
FUJIMOTO H, 1994, J SICE, V33, P533
[2]   A flexible simulation system for scheduling with various constraints [J].
Hasebe, S ;
Murakami, Y ;
Hashimoto, I .
JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 1996, 29 (02) :323-329
[3]  
Kise H., 1997, Transactions of the Institute of Systems, Control and Information Engineers, V10, P98, DOI 10.5687/iscie.10.98
[4]  
MURAKAMI Y, 1993, AICHE ANN M ST LOU D, V144, P1
[5]  
NABESHIMA I, 1974, SCHEDULING RIRON, P22
[6]  
Tamaki H., 1995, Transactions of the Society of Instrument and Control Engineers, V31, P1193
[7]  
Tamaki H., 1995, Transactions of the Society of Instrument and Control Engineers, V31, P933