Developing a Risk Management Process for General Contractors in the Bidding Stage for Design-Build Projects in Vietnam

被引:8
|
作者
Pham, Duy-Hoang [1 ]
Ly, Dang-Huy [1 ]
Tran, Ngoc-Khue [2 ]
Ahn, Yong-Han [3 ]
Jang, Hyeongjae [4 ]
机构
[1] Hanyang Univ, Dept Smart City Engn, ERICA Campus, Ansan 15588, South Korea
[2] RICONS Grp Construct Investment JSC, COTECCONS Grp, Tech & Tender Dept, Ho Chi Minh City 70000, Vietnam
[3] Hanyang Univ, Sch Architecture & Architectural Engn, ERICA Campus, Ansan 15588, South Korea
[4] Hanyang Univ, Dept Architectural Engn, ERICA Campus, Ansan 15588, South Korea
关键词
risk management; tendering; bidding; design-build; Vietnam;
D O I
10.3390/buildings11110542
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design-build (DB) projects have become increasingly popular for construction projects in developing countries due to the cost and scheduling advantages and their design optimization ability. As a result, much research has been conducted on improving DB efficiency in terms of cost, scheduling, risk management, etc. However, the existing studies have mainly focused on the owner's roles, whereas general contractors (GCs) must also take many risks on behalf of owners in DB projects. The adequate identification and assessment of risks before engaging a contractor can increase the likelihood of a project's success, at least from a DB contractor's perspective. Therefore, this study interviewed procurement experts to conduct a survey at the local level, then analyzed, developed, and proposed an additional risk management process (RMP) for use by GCs during the bidding process of DB projects. A case study was conducted with a large Vietnamese GC to evaluate the effectiveness of the process and find ways to optimize it in the future. The results of the study showed that risk management during a DB project is imperative. Nevertheless, preparing bids is time-consuming and increases the contingency costs, reducing the competitiveness of the bid prices for contractors. Therefore, depending on the specific project and risk management objectives, an RMP is recommended for adjusting the risk management target to reduce the risk, while still maintaining the competitiveness of the bid prices.
引用
收藏
页数:14
相关论文
共 43 条
  • [1] Contractors' influence within the design process of design-build projects
    Haroglu, H.
    Glass, J.
    Thorpe, T.
    Goodchild, C.
    CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 693 - 698
  • [2] Risk Management in Engineering and Construction A Case Study in Design-Build Projects in Vietnam
    Phong Thanh Nguyen
    Phu-Cuong Nguyen
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (01) : 5237 - 5241
  • [3] Critical success factors for implementation process of design-build projects in Vietnam
    Chau Ngoc Dang
    Long Le-Hoai
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2016, 14 (01) : 17 - 32
  • [4] Dynamic Management of Risk Contingency in Complex Design-Build Projects
    De Marco, Alberto
    Rafele, Carlo
    Thaheem, Muhammad Jamaluddin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
  • [5] Risk allocation in design-build and BOT projects
    Nielsen, KR
    CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 37 - 53
  • [6] Impact of Design Risk on the Performance of Design-Build Projects
    Liu, Junying
    Xie, Qunxia
    Xia, Bo
    Bridge, Adrian J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (06)
  • [7] Risk allocation for subsurface conditions: design-build projects
    Hatem, DJ
    NORTH AMERICAN TUNNELING 2000: UNDERGROUND CONSTRUCTION: THE REVOLUTION CONTINUES, 2000, : 97 - 123
  • [8] Process modeling for design-build project management
    Jin, Y
    Christiansen, T
    Levitt, RE
    Teicholz, P
    COMPUTING IN CIVIL ENGINEERING, 1996, : 642 - 648
  • [9] Impact of Risk on Design-Build Selection for Highway Design and Construction Projects
    Tran, Dai Q.
    Molenaar, Keith R.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 153 - 162
  • [10] Managing Geotechnical Risk on US Design-Build Transport Projects
    McLain, Kevin
    Gransberg, Douglas
    Loulakis, Micheal
    CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (01): : 1 - 19