共 24 条
[2]
Bozek A., 2017, INT J PROD RES, P1
[3]
Chen H., 1999, IEEE INT C ROB AUT
[4]
Deb K., 2000, Parallel Problem Solving from Nature PPSN VI. 6th International Conference. Proceedings (Lecture Notes in Computer Science Vol.1917), P849
[6]
A new critical path method and a memetic algorithm for flexible job shop scheduling with overlapping operations
[J].
SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL,
2013, 89 (03)
:264-277
[9]
Gang C., 2015, SYSTEMS ENG, V53, P149