Permutation flowshop scheduling problem with Total Core Idle Time Minimization

被引:1
|
作者
Sanchez-de-los-Reyes, Paula [1 ]
Perez-Gonzalez, Paz [1 ]
Framinan, Jose M. [1 ,2 ]
机构
[1] Univ Seville, Ind Management Res Grp, Seville 41092, Spain
[2] Univ Seville, Lab Engn Energy & Environm Sustainabil, Seville 41092, Spain
来源
IFAC PAPERSONLINE | 2022年 / 55卷 / 10期
关键词
Production scheduling; metaheuristic; permutation flowshop; optimization; ITERATED GREEDY ALGORITHM; BLOCKING;
D O I
10.1016/j.ifacol.2022.09.388
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we present a deterministic permutation flowshop scheduling problem with a new objective function, the total core idle time. The interest of this objective is related to reduce the energy consumption of the system, taking into account that the energy needed during the processing times is constant, and that machines are switched off during the front and back idle times. Therefore, the energy consumption is dependent on the time where machines are in stand-by mode, i.e during the idle time of machines between jobs, named as core idle times. Constructive heuristics and metaheuristics are adapted from the permutation flowshop scheduling literature for classical objectives as makespan and total completion time. Additionally, a new variant of one of the metaheuristic is proposed, the VBIH-P. An experimental evaluation has been carried out to analyse the performance of all the methods. The results show an excellent performance of the VBIH-P compared to the adapted methods. Copyright (C) 2022 The Authors.
引用
收藏
页码:187 / 191
页数:5
相关论文
共 50 条
  • [1] A Discrete Artificial Bee Colony for Distributed Permutation Flowshop Scheduling Problem with Total Flow Time Minimization
    Pan, Jia-Qi
    Zou, Wen-Qiang
    Duan, Jun-hua
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 8379 - 8383
  • [2] Permutation flowshop problems minimizing core waiting time and core idle time
    Alfieri, Arianna
    Garraffa, Michele
    Pastore, Erica
    Salassa, Fabio
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 176
  • [3] Distributed permutation flowshop scheduling problem with total completion time objective
    Ali, Arshad
    Gajpal, Yuvraj
    Elmekkawy, Tarek Y.
    OPSEARCH, 2021, 58 (02) : 425 - 447
  • [4] Distributed permutation flowshop scheduling problem with total completion time objective
    Arshad Ali
    Yuvraj Gajpal
    Tarek Y. Elmekkawy
    OPSEARCH, 2021, 58 : 425 - 447
  • [5] Benders decomposition for the mixed no-idle permutation flowshop scheduling problem
    Tolga Bektaş
    Alper Hamzadayı
    Rubén Ruiz
    Journal of Scheduling, 2020, 23 : 513 - 523
  • [6] Benders decomposition for the mixed no-idle permutation flowshop scheduling problem
    Bektas, Tolga
    Hamzadayi, Alper
    Ruiz, Ruben
    JOURNAL OF SCHEDULING, 2020, 23 (04) : 513 - 523
  • [7] The distributed no-idle permutation flowshop scheduling problem with due windows
    Mousighichi, Kasra
    Avci, Mualla Gonca
    COMPUTATIONAL & APPLIED MATHEMATICS, 2024, 43 (04):
  • [8] An asynchronous genetic local search algorithm for the permutation flowshop scheduling problem with total flowtime minimization
    Xu, Xiao
    Xu, Zhenhao
    Gu, Xingsheng
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (07) : 7970 - 7979
  • [9] An efficient heuristic approach to total flowtime minimization in permutation flowshop scheduling
    Laha, Dipak
    Chakraborty, Uday K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (9-10): : 1018 - 1025
  • [10] An efficient heuristic approach to total flowtime minimization in permutation flowshop scheduling
    Dipak Laha
    Uday K. Chakraborty
    The International Journal of Advanced Manufacturing Technology, 2008, 38 : 1018 - 1025